My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. BASR 06-11-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2010-2019
>
2013
>
06-11-2013
>
3. BASR 06-11-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2013 8:41:06 AM
Creation date
6/7/2013 8:36:52 AM
Metadata
Fields
Template:
City Government
type
BASR
date
6/11/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOLID ROCK CHURCH <br /> and World Outreach Center <br /> Dr. Bill Matthews, Pastor <br /> May 28, 2013 <br /> Elk River Board of Adjustments <br /> City of Elk River <br /> 13065 Orono Parkway <br /> Elk River, MN 55330 <br /> Dear Elk River Board of Adjustments: <br /> Solid Rock Church is requesting a variance to be granted on the 2.5 acre requirement for a lot size for <br /> two basic reasons. <br /> 1) With changes in banking and lending requirements, since the economic turndown, our lending <br /> institution,The Bank of Elk River, has requested that we put our two existing staff homes on <br /> separate lots from the church property. When the Brentwood edition was originally platted,the <br /> property the church owns, Brentwood Block 9, Lots 1-8,were all separate lots. In 1994 the <br /> county requested that all the lots be combined for ease of records, since we owned all of lots in <br /> Block 9. <br /> 2) Additionally, we would like to build an additional staff home on the property,which would be a <br /> single family dwelling. <br /> We are asking for a variance because the City of Elk River has changed the requirements for a lot size. <br /> All of our lots were originally 2 acres or under, with three being under 1.5 acres. Now the current <br /> requirement is 2.5 acres. We are proposing a four lot split of the church property as follows: <br /> Parcel A would be 1.85 acres, existing home <br /> Parcel B would be 1.65 acres, existing home <br /> Parcel C would be 1.50 acres,future home <br /> Parcel D would be 8.06 acres, existing church building <br /> What we are proposing is in harmony with the Brentwood neighborhood and with The City of Elk River's <br /> plan when the lots were originally plotted. This variance would also be in harmony with The City of Elk <br /> River's comprehensive plan. <br /> Sincerely/ / <br /> '/ for <br /> r <br /> Bill Matthews <br /> Pastor/President <br /> 11800 196th Avenue NW * Elk River, MN 55330 * 763.441.2816 * Fax 763.441.1053 <br /> www.srchurch.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.