My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10. SR 05-20-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
05-20-2013
>
4.10. SR 05-20-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2013 3:40:57 PM
Creation date
5/16/2013 10:57:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
insituform 1177 Birch Lake Blvd.N Tel: 651 253-0236 <br /> White Bear Lake,MN 55110 Fax: (651)344-0806 <br /> www.insituform.com <br /> April 11, 2013 (updated 4.25 13) <br /> Mr.Matt Stevens <br /> City of Elk River <br /> 13065 Orono Parkway <br /> Elk River,MN 55330 <br /> RE: Insituform®Rehabilitation of approximately 2402 If of 8" Sanitary sewer <br /> Elk River,MN <br /> Dear Mr Stevens: <br /> Insituform Technologies USA,LLC. (ITUSA) is pleased to submit to you a proposal to <br /> CIPP line approximately 2402 If of 8" sanitary sewer. <br /> Over the past 35 years, ITI has rehabilitated over 75 million feet of sewer and drainage <br /> piping worldwide. The Insituform®process consists of installing a specifically designed <br /> resin saturated polyester felt tube into the exiting sewer and curing it in place. The result <br /> is a seamless,jointless durable composite pipe within the old pipe, improving its structure <br /> and minimizing leakage. The piping is returned to service in a fraction of the time <br /> required by conventional methods. As a result,the Insituform®process is faster,cleaner, <br /> safer, and performed at less cost than other repair alternatives. <br /> Following is a cost proposal for installation of approximately 2402 if of 8"Insituform® <br /> Cured-in-Place Pipe designed as a fully structural pipe once installed. <br /> Tom. <br /> 1 CIPP 81, 2402 LF $ 2510 $ 60,290.20 <br /> 2 Lateral Reinstatements 33 EA $ 93.80 $ 2,814-00 <br /> 3 Protrucing Tap Removal 0 EA $ 500.00 $ - <br /> 4 Foot cutting - HR $ 500.00 $ - <br /> Total I 1 1 $ 63,104.20 <br /> This proposal serves as an estimate for completion of the work and can be adjusted to <br /> take into consideration any unforeseen circumstances that may arise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.