My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 04-09-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
04-09-2013
>
6.1. ERMUSR 04-09-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2013 1:30:00 PM
Creation date
5/7/2013 1:29:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Line Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> April 9, 2013 6.1 <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Continue tree trimming. <br /> • Continue fixing problems that the infrared camera finds. <br /> • Continue working on changing out our overhead cutouts and fuses. With this we go <br /> through checking padmount transformers and padmount switch gear making sure nothing <br /> is leaking, the proper tags are in place, the map book matches the tags, and all the <br /> warning stickers are on the outside. <br /> • Had five new house services. <br /> • The City shop is working on D.O.T. inspections on our trucks and trailers. This is done <br /> on an annual basis. <br /> • Finished hooking up Barton's Pit service. They upgraded their service size and moved the <br /> location of the service. <br /> • We posted an opening for Lead Lineperson position internally. This is to fill the position <br /> Art Gatchell held before he retired. After Art retired we hired a Journeyman Lineperson, <br /> so we delayed filling the Lead Lineperson position. We have also posted a job opening <br /> for summer help. I contacted the four colleges in Minnesota that have the line workers <br /> course so we can get someone with basic electrical knowledge and a class A driver's <br /> license. We are going to monitor the work load this summer and see if we should put the <br /> fifth crew back on in 2014, which would require hiring one more full time line worker. <br /> This crew would use an existing bucket truck. <br /> a.. <br /> Page 1 of 1 P Y I E A E l BY <br /> INATUREJ Reliable Public <br /> Power Provider P o w r a r o T o S rRvr <br />
The URL can be used to link to this page
Your browser does not support the video tag.