My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. ICESR 04-09-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2013
>
04-09-2013
>
7.2. ICESR 04-09-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 2:53:42 PM
Creation date
4/17/2013 2:53:37 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ICE ARENA—ICE SYSTEM EVALUATION AND RECOMMENDATIONS <br /> Estimated Project Costs <br /> The proposed cost estimates presented throughout this report <br /> were developed by estimating the probable construction costs <br /> based on similar types of construction projects and work <br /> performed and bid in 2008-2012 and updated for 2013 costs <br /> unless otherwise noted. The estimated costs include all <br /> materials and labor for a complete installation unless otherwise <br /> noted. Costs will vary depending on the time of year the <br /> projects are bid, the current economic climate and the size of <br /> project. <br /> In addition to the probable construction costs of the proposed <br /> work, other associated project costs are included to provide a <br /> total estimate cost for the project. The Estimate, Design and <br /> Construction Contingency line item in each cost table is included <br /> during the evaluation phase of projects since the exact scope of <br /> the project has not yet been determined. This percentage is <br /> typically reduced from 15% to 5% during the final design phase <br /> of the project. <br /> The Engineering, Legal and Administrative line item in each cost <br /> table is provided to cover all work performed by the design <br /> team and all legal and administrative work required by the City <br /> for projects of this type. <br /> Applicable Codes and Standards <br /> The following codes were considered during the evaluation: <br /> • Minnesota State Building Code, 2007, including Chapter <br /> 1341 Accessibility Code <br /> • International Building Code, 2006 <br /> • 2007 Minnesota State Fire Code (International Fire Code, <br /> 2006) <br /> • International Mechanical Code,2006 <br /> • 2009 Minnesota State Mechanical Code <br /> • NFPA 70(NEC), 2008 <br /> • Department of Labor & Industry— High Pressure Piping and <br /> Code for Power Piping Systems, Chapters 326 (MN Statues <br /> 1999) and Chapter 5230(MN Rules 2001) <br /> • ANSI/ASHRAE Standard 15-2007 <br /> • The City's CODE OF ORDINANCES were not reviewed or <br /> referenced for this evaluation. <br /> OStevens <br /> ENGINEERS PLANNER SURVEYORS <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.