Laserfiche WebLink
2/28/2013 <br /> Li uid Stream Im rovements Cost Estimate <br /> Item Cost <br /> Design Option No.1 Design Option No.2 <br /> Mobilization $300,000 $300,000 <br /> Site Work $600,000 $600,000 <br /> Site Pi in /Valves $200,000 $200,000 <br /> Grit Cyclone $15,000 $15,000 <br /> Clarifier Equipment forExistin and New 4 $500,000 $500,000 <br /> New Clarifier Structure 2 $200,000 $200,000 <br /> Trickling Filter Im rovements $250,000 $250,000 <br /> Activated Sludge Basins $1,350,000 $1,950,000 <br /> Fine Pore Diffusers $140,000 $200,000 <br /> Blowers $250,000 $300,000 <br /> Secondary Clarifier Covers 3 $300,000 $300,000 <br /> RAS/WAS Building and Pumps $200,000 $200,000 <br /> Filter Chlorination System $30,000 $30,000 <br /> UV Upgrades $200,000 $400,000 <br /> Blower/Sludge Pum in Building $200,000 $200,000 <br /> Electrical/Contrels $1,500,000 $1,700,000 <br /> New Control Building/Garage $1,200,000 $1,200,000 <br /> Total Construction Cost $7,435,000 $8,495,000 <br /> Contin enc 10% $744,000 $850,000 <br /> En ineerin /Admin 15% $1,115,000 $1,274,000 <br /> Total Project Cost $9,294,000 $10,619,000 <br /> BC7o—TC7y,J r-I E=—[V FC, I r---A C. <br /> 15 <br /> Biosolids Handling Alternatives <br /> • Construct a Heat Drying Facility <br /> — Small Footprint <br /> — Produces Class A Biosolids <br /> — Reduces Volume Required for Land Application <br /> — High Capital Cost <br /> — Higher Operating Cost <br /> • Expand Anaerobic Digestion System <br /> — Extremely Large Footprint <br /> — Requires Large Biosolids Storage Volume <br /> — Large Quantity of Biosolids to be Land Applied <br /> — High Capital Costs <br /> — Not Practical Given the Land Constraints of the Site <br /> BOL—rc--wV S.r44 E—= ir-C— <br /> [mulling Engineers&Surveyors <br /> 8 <br />