2/28/2013
<br /> Li uid Stream Im rovements Cost Estimate
<br /> Item Cost
<br /> Design Option No.1 Design Option No.2
<br /> Mobilization $300,000 $300,000
<br /> Site Work $600,000 $600,000
<br /> Site Pi in /Valves $200,000 $200,000
<br /> Grit Cyclone $15,000 $15,000
<br /> Clarifier Equipment forExistin and New 4 $500,000 $500,000
<br /> New Clarifier Structure 2 $200,000 $200,000
<br /> Trickling Filter Im rovements $250,000 $250,000
<br /> Activated Sludge Basins $1,350,000 $1,950,000
<br /> Fine Pore Diffusers $140,000 $200,000
<br /> Blowers $250,000 $300,000
<br /> Secondary Clarifier Covers 3 $300,000 $300,000
<br /> RAS/WAS Building and Pumps $200,000 $200,000
<br /> Filter Chlorination System $30,000 $30,000
<br /> UV Upgrades $200,000 $400,000
<br /> Blower/Sludge Pum in Building $200,000 $200,000
<br /> Electrical/Contrels $1,500,000 $1,700,000
<br /> New Control Building/Garage $1,200,000 $1,200,000
<br /> Total Construction Cost $7,435,000 $8,495,000
<br /> Contin enc 10% $744,000 $850,000
<br /> En ineerin /Admin 15% $1,115,000 $1,274,000
<br /> Total Project Cost $9,294,000 $10,619,000
<br /> BC7o—TC7y,J r-I E=—[V FC, I r---A C.
<br /> 15
<br /> Biosolids Handling Alternatives
<br /> • Construct a Heat Drying Facility
<br /> — Small Footprint
<br /> — Produces Class A Biosolids
<br /> — Reduces Volume Required for Land Application
<br /> — High Capital Cost
<br /> — Higher Operating Cost
<br /> • Expand Anaerobic Digestion System
<br /> — Extremely Large Footprint
<br /> — Requires Large Biosolids Storage Volume
<br /> — Large Quantity of Biosolids to be Land Applied
<br /> — High Capital Costs
<br /> — Not Practical Given the Land Constraints of the Site
<br /> BOL—rc--wV S.r44 E—= ir-C—
<br /> [mulling Engineers&Surveyors
<br /> 8