Laserfiche WebLink
2/28/2013 <br /> Existing WWTF — Needed Imp. (cont.� <br /> • Disinfection <br /> — Install New UV Equipment in the Existing Spare Channel <br /> • Electrical/Controls <br /> — Update Controls System to Provide a Centralized Control <br /> System for All Treatment Units <br /> • Biosolids Handling <br /> — Use Anaerobic Digestion Process to Reduce Biosolids Volume <br /> — Provide Sludge Pumping to Great River Energy(GKE) <br /> • Other <br /> — Construct a New Control Building with Garage Space <br /> BC LTI'Dr-,J 8.I\/I E r-,j I N C. <br /> 11 <br /> _ <br /> 1 1 <br /> I 1 <br /> I 1 ` <br /> BOLTCafV 8.Ih/IEfV K. INC. <br /> Comil inp Engineers&Sumps <br /> 6 <br />