Laserfiche WebLink
Permit Issued: Elk River WNVTP Page 25 <br /> Permit Expires: Pe nit :MN0020788 <br /> DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT <br /> Chapter 8. Total Facility Requirements <br /> 1. General Requirements <br /> 1.19 Maintain Records, The Permittee shall keep the records required by this permit for at least three years, <br /> including any calculations,original recordings from automatic monitoring instruments,and laboratory sheets. <br /> The Permittee shall extend these record retention periods upon request of the MPCA.The Permittee shall <br /> maintain records for each sample and measurement.The records shall include the following information(Minn. <br /> R. 7001.0150, subp.2,item C): <br /> a. The exact place,date,and time of the sample or measurement; <br /> b. The date of analysis; <br /> c. The name of the person who performed the sample collection,measurement,analysis,or calculation; and <br /> d. The analytical techniques,procedures and methods used; and <br /> e. The results of the analysis. <br /> 1.20 Completing Reports. The Permittee shall submit the results of the required sampling and monitoring activities <br /> on the forms provided,specified,or approved by the MPCA. The information shall be recorded in the specified <br /> areas on those forms and in the units specified. (Minn.R.7001.1090,subp. 1,item D;Minn.R.7001.0150, <br /> subp.2,item B) <br /> Required forms may include: <br /> Supplemental Report Form(Supplemental) <br /> Individual values for each sample and measurement must be recorded on the Supplemental which,if required, <br /> will be provided by the MPCA. Supplementals shall be submitted with the appropriate DMRs.You may design <br /> and use your own Supplemental;however it must be approved by the MPCA. Note: Required Summary <br /> 'information MUST also be recorded on the DMR. Summary information that is submitted ONLY on the <br /> Supplemental does not comply with the reporting requirements. <br /> 1.21 Submitting Reports. DMRs and Supplementals shall be submitted to: <br /> MPCA <br /> Attn: Discharge Monitoring Reports <br /> 520 Lafayette Road North <br /> St.Paul,Minnesota 55155-4194. <br /> DMRs and Supplementals shall be postmarked by the 21 st day of the month following the sampling period or as <br /> otherwise specified in this permit. A DMR shall be submitted for each required station even if no discharge <br /> occurred during the reporting period. (Minn.R.7001.0150,subps.2.13 and 3.11) <br /> Other reports required by this permit shall be postmarked by the date specified in the permit to: <br /> MPCA <br /> Attn: WQ Submittals Center - <br /> 520 Lafayette Road North <br /> St.Paul,Minnesota 55155-4194 <br /> 1.22 Incomplete or Incorrect Reports. The Permittee shall immediately submit an amended report or DMR to the <br /> MPCA upon discovery by the Pemtittee or notification by the MPCA that it has submitted an incomplete or <br /> incorrect report or DMR. 'The amended report or DMR shall contain the missing or corrected data along with a <br /> cover letter explaining the circumstances of the incomplete or incorrect report.(Minis.R.7001.0150 subp. 3, <br /> item G) <br />