Permit Issued: Elk River i?VW TP Page 16 <br /> ..Pennit Expires: Permit#:MN0020788 <br /> DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT <br /> Chapter 1. Compliance Schedule <br /> 1. Compliance Related Construction Schedule <br /> Definitions <br /> 1.1 "Initiation of operation"means the date that MPCA determines all components of the the wastewater treatment <br /> system are complete and functioning and the project begins operating for the purposes for which it was planned, <br /> designed,and built. <br /> 1.2 "Completion of construction"means all the construction is complete except for minor weather-related <br /> components and conforms to the approved plans and specifications and change orders. <br /> 1.3 "Notice to proceed"means a written notice given by the Permittee to the contractor that affixes the contract <br /> effective date and the date that the contractor begins performing the work specified in the contract documents. <br /> Schedule <br /> 1.4 The Permittee must submit a copy of the executed Notice to Proceed to MPCA within 14 days after its <br /> execution. <br /> 1.5 The Permittee must notify the MPCA in writing at least 14 days before prior to the initiation of operations. <br /> Following MPCA staffs concurrence that the facility is adequately prepared,MPCA staff will notify the <br /> Permittee that it may initiate operation of the new or upgraded facility. <br /> 1.6 The Permittee must notify the MPCA in writing within 14 days after the actual initiation of operations date. <br /> 1.7 The Permittee must notify the MPCA in writing at least 14 days before the planned completion of construction <br /> date. The MPCA may complete a final inspection. <br /> 1.8 The MPCA must submit the following to the MPCA within one year after the initiation of operation date: <br /> a. An MPCA-approved certification form that is signed by a professional engineer registered in the state of <br /> Minnesota stating that the project meets the performance standards. <br /> b. A revised operation and maintenance.manual or a maintenance plan;or a certificate of completion of an <br /> opeation and maintenance manual on a form presecribed by the MPCA.At a minimum,this plan must include a <br /> detailed discussion of operation and controls,maintenance,sampling and analysis,problem mitigation,VOC <br /> management;personnel records and reporting and saftey.This plan must be maintained and updated regularly <br /> and made available to MPCA staff upon request. <br /> c. One copy of the as-built plans and specifications on microfiche.Full size plan sheets(24 inches by 36 inches <br /> or 22 inches by 34 inches)must by provided at 24X reduction and mounted in a white aperture card.Reduced <br /> size plan sheets( l I inches by 11 inches)must be provided at l OX reduction.The specifications must be <br /> provided at 25X reduction in five-channel,white,6 x 4 microfilm jackets.Documents must be filmed on <br /> negative silver film- <br /> Chapter 2. Biosolids Land Application <br /> 1. authorization <br /> 1.1 This permit authorizes the Permittee to store and Iand apply domestic wastewater treatment biosolids in <br /> accordance with the provisions in this chapter and Minnesota Rules,eh. 7041. <br /> 1.2 Perinittees who prepare bulk biosolids must obtain approval of the sites on which bulk biosolids are applied <br /> before they are applied unless they are exceptional quality biosolids. Site application procedures arse set forth in <br /> Minnesota Rules,pt.7041.0800. <br />