My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT <br /> Page 2 <br /> Permit MN0020788 <br /> Table of Contents <br /> Permitted Facility Description 3-4 <br /> Topographic Map of Permitted Facility 5 <br /> Summary of Stations and Station Locations 6 <br /> Limits and Monitoring Requirements _ 7-15 <br /> Chapter 1. Compliance Schedule 16 <br /> 1. Compliance Related Construction Schedule <br /> Chapter 2. Biosolids Land Application 16-20 <br /> L Authorization <br /> 2. Compliance Responsibility <br /> 3. Notification Requirements <br /> 4. Pollutant Limits <br /> 5. Pathogen and Vector Attraction Reduction <br /> 6. Management Practices <br /> 7. Monitoring Requirements <br /> 8. Records <br /> 9. Reporting Requirements <br /> Chapter 3. Domestic Wastewater--Mechanical System 20 <br /> L Bypass Structures <br /> 2. Sanitary Sewer Extension Permit <br /> 3. Operator Certification <br /> Chapter 4. Non-waste.Streams- Mercury Management Plan 20-21 <br /> 1. Mercury Pollutant Minimization Plan <br /> Chapter 5. Phosphorus Management Plan 22 <br /> 1. General Requirements <br /> Chapter 6. Surface Discharge Stations 22-23 <br /> 1. Requirements for Specific Stations <br /> 2. Sampling Location <br /> 3. Surface Discharges <br /> 4. Discharge Monitoring Reports <br /> Chapter 7. Waste Stream Stations 23 <br /> 1. Requirements for Specific Stations <br /> 2. Special Requirements <br /> 3. Sampling Location <br /> Chapter 8. Total Facility Requirements 23-30 <br /> L General Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.