My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the digester volume required, additional sludge storage space is <br /> needed to meet the design conditions. In order to provide 180 days of storage for <br /> biosolids at 4 percent solids, the Elk River WWTF would need an additional 2.8 <br /> MG of sludge storage for Design Option No. 1 and 3.8 MG for Design Option <br /> No. 2. <br /> Do to the excessive land requirements for the required digesters and sludge <br /> storage, expansion of the anaerobic digestion system is not viewed as a feasible <br /> option and will not be analyzed any further in this report. <br /> 4.3.3. Heat Drying <br /> The heat drying process for biosolids treatment consists of aerated biosolids <br /> storage, dewatering, and heat drying. To implement this process at the Elk River <br /> WWTF, aeration equipment would be added to the existing biosolids storage <br /> tanks to provide aerated storage. A biosolids processing building would be <br /> constructed to house the dewatering and drying equipment as well as storage for <br /> the dried biosolids. The end product would be roughly 90 percent solids and <br /> would be stored until land application. Design of the heat drying system would <br /> include provisions to meet both design conditions. The location of the proposed <br /> biosolids building is shown in Figures 4.1 and 4.3 while a biosolids process flow <br /> diagram for this option is provided in Figure 4.5. <br /> 4.3.4. Regionalization <br /> Regionalization for biosolids treatment could be done with the City of Buffalo for <br /> contract biosolids treatment. In this partnership the City of Elk River would be <br /> responsible for hauling biosolids to the Buffalo WWTF which could be contracted <br /> out to a licensed biosolids hauler. The City of Elk River would also have to pay a <br /> set fee for treatment of biosolids based on total dry tons of sludge treated. <br /> City of Elk River—T12.104758 Page 26 <br /> Wastewater Treatment Facility Plan Prepared by Bolton&Menk,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.