4.2.1.8. Filters <br /> The existing gravity filters have a design flow of 7.0 MGD and will have adequate <br /> capacity to meet the PHWW flow of 5.68MGD for the design year 2035. To optimize <br /> filter operation, modifications of the filter controls, media, and the chlorine feed system <br /> will be evaluated. Modifications to the chlorine feed system shall include an inline <br /> chlorine analyzer to protect against over chlorination. <br /> 4.2.1.9. Disinfection <br /> Capacity of the existing UV system at PHWW flow is 3.0 MGD which is 2.67 MGD <br /> short in capacity for Design Option No. 1. To meet the design requirements, new UV <br /> equipment would need to be installed in the existing spare channel which would increase <br /> the total capacity at PHWW flow to 6.0 MGD. Additional improvements would include <br /> replacing the effluent weir on the existing UV channel with a fixed depth finger weir. <br /> 4.2.1.10. Electrical/Controls <br /> The existing control system does not include a central control system for the entire <br /> wastewater treatment facility. Upgrades to the control system will include a new control <br /> building with a centralized control system that will allow the operators to monitor and <br /> control all units of the treatment process from one location. A new control building and <br /> garage area is needed since the activated sludge process will require removal of the <br /> existing control building and garage space. The new control building will house the <br /> upgraded control system and will also include laboratory and garage areas. <br /> 4.2.2. Design Option No. 2 <br /> Detailed descriptions of the improvements for each unit process for Design Option No. 2 <br /> are presented in the following sections. An updated site plan with the needed <br /> improvements is present in Figure 4.3. The process flow diagram for Design Option No. <br /> 2 is identical to the process flow diagram for Design Option No. 1 which was presented <br /> in Figure 4.2. <br /> City of Elk River—T12.104758 Page 20 <br /> Wastewater Treatment Facility Plan Prepared by Bolton&Menk,Inc. <br />