Laserfiche WebLink
3.2.3. Grit Removal <br /> Following flow measurement, wastewater flows to the vortex grit removal process. The <br /> existing grit tank is an exterior tank located just east of the Headworks Building. The <br /> existing grit tank has a 10 foot diameter and a side water depth of 11 1/2 feet. The <br /> maximum capacity of the existing grit removal system is 7.0 MGD with a bypass inplace <br /> for peak instantaneous flows. The grit settled at the bottom of the tank is pumped to a <br /> grit classifier, where grit is further washed before it is discharged into a dumpster for <br /> disposal. <br /> The existing grit removal process would meet the requirements for Design Option No. I <br /> and No. 2. <br /> 3.2.4. Primary Clarifiers <br /> Following grit removal, wastewater flows to a splitter structure where it is evenly split <br /> between two primary clarifiers. The existing primary clarifiers are each 40 feet in diameter <br /> with a side water depth of 9 feet. Maximum AWW flow and PHWW flow of each clarifier <br /> are 1.25 MGD and 1.51 MGD, respectively. The combined maximum AWW and PHWW <br /> flows are 2.50 MGD and 3.02 MGD, respectively. <br /> The existing clarifiers do not meet AWW and PHWW flow requirements for Design <br /> Options No. I and No. 2. In Addition, the existing collection mechanism in both primary <br /> clarifiers is in need of replacement due to their age. <br /> 3.2.5. Trickling Filters <br /> Following the primary clarifiers, wastewater flows to the trickling filter pump station <br /> where it is pumped to the top of the trickling filters. The existing filters consist of two <br /> trickling filters that are each 26 feet deep with a 45 foot diameter. The top 2 feet of media <br /> is a cross flow type while the bottom 24 feet is a vertical flow type plastic media. The <br /> specific surface area of the media is 30 square feet per cubic foot. Each trickling filter has <br /> a two-arm distributor to evenly apply wastewater on the media. <br /> City of Elk River—T12.104758 Page 10 <br /> Wastewater Treatment Facility Plan Prepared by Bolton&Menk,Inc. <br />