Laserfiche WebLink
Biosolids Handling Alt.’s (Cont.) <br />Pump to Great River Energy (GRE) for Incineration <br /> <br />Minimal Capital Costs <br />– <br />Extremely Low Operating Costs <br />– <br />Minimal Operator Time Requirements <br />– <br />Regionalization (City of Buffalo) <br /> <br />Minimal Capital Cost <br />– <br />High Treatment and Hauling Costs <br />– <br />Not Economically Feasible as a Long Term Solution <br />– <br />Should be Discussed with the City of Buffalo as a Backup <br />– <br />Plan <br />17 <br />