Laserfiche WebLink
Liquid Stream Improvements Cost Estimate <br />ItemCost <br />Design Option No. 1Design Option No. 2 <br />Mobilization$300,000$300,000 <br />Site Work$600,000$600,000 <br />Site Piping/Valves$200,000$200,000 <br />Grit Cyclone$15,000$15,000 <br />Clarifier Equipment for Existing and New (4)$500,000$500,000 <br />New Clarifier Structure (2)$200,000$200,000 <br />Trickling Filter Improvements$250,000$250,000 <br />Activated Sludge Basins $1,350,000$1,950,000 <br />Fine Pore Diffusers$140,000$200,000 <br />Blowers$250,000$300,000 <br />Secondary Clarifier Covers (3)$300,000$300,000 <br />RAS/WAS Building and Pumps$200,000$200,000 <br />Filter Chlorination System$30,000$30,000 <br />UV Upgrades$200,000$400,000 <br />Blower/Sludge Pumping Building$200,000$200,000 <br />Electrical/Controls$1,500,000$1,700,000 <br />New Control Building/Garage$1,200,000$1,200,000 <br />Total Construction Cost <br />$7,435,000$8,495,000 <br />Contingency (10 %)$744,000$850,000 <br />Engineering/Admin (15%)$1,115,000$1,274,000 <br />Total Project Cost$9,294,000$10,619,000 <br />15 <br />