Laserfiche WebLink
Existing WWTF –Needed Imp. (cont.) <br />Disinfection <br /> <br />Install New UV Equipment in the Existing Spare Channel <br />– <br />Electrical/Controls <br /> <br />Update Controls System to Provide a Centralized Control <br />– <br />System for All Treatment Units <br />Biosolids Handling <br /> <br />Use Anaerobic Digestion Process to Reduce Biosolids Volume <br />– <br />Provide Sludge Pumping to Great River Energy (GRE) <br />– <br />Other <br /> <br />Construct a New Control Building with Garage Space <br />– <br />11 <br />