Laserfiche WebLink
Minnesota Pollution Environmental Information <br /> Control Agency+ <br /> 520 Lafayette Road Worksheet (EIW) Form <br /> StYaul,MN55155-1194 Clean Water State Revolving Fund <br /> Minnesota Rule Chapter 7077.0272, subp. 2.a.F. <br /> Minnesota Rule Chapter 7077.0277, subp. 3.E. <br /> Doc Type:Environmental Information Worksheet <br /> Eligible applicants seeking funds for clean water(stormwater and wastewater) projects through the Clean Water State Revolving <br /> Fund (commonly referred to as the CWSRF Program) are required by Minn. R. ch. 7077.0272, subp. 2.a. F. and Minn. R. ch. <br /> 7077.0277, subp. 3.E.,to complete an Environmental Information Worksheet(EIW). This information will be used to assess <br /> environmental impacts, if any, caused by the project. <br /> For assistance with this worksheet, please visit the Minnesota Pollution Control Agency's website at <br /> http://www.pca.state.mn.us/publications/p-earl-02.Ddf for detailed instructions on completing this form. <br /> 1. Project title: Elk River Wastewater Treatment Facility Improvements <br /> 2. Proposer: City of Elk River <br /> Contact person: Seth Peterson, P.E. <br /> Title: Principal Engineer, Bolton &Menk, Inc. <br /> Address: 12224 Nicollet Avenue <br /> Burnsville, MN 55337 <br /> Phone: 952-890-0509 <br /> Fax: 952-890-8065 <br /> 3. Project location: County: Sherburne City/Twp: Elk River <br /> NE 1/4 1/4 Section: 3 Township: 32N Range: 26W <br /> Tables, Figures, and Appendices attached to the EIW: <br /> • County map showing the general location of the project; <br /> • United States Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries(photocopy acceptable); <br /> • Site plan showing all significant project and natural features. <br /> 4. Description: <br /> a. Provide a project summary of 50 words or less. <br /> Improvements to the existing wastewater treatment facility including new primary clarifiers, new blower and sludge pumping <br /> buildings, and a new extended aeration activated sludge tank. <br /> b. Give a complete description of the proposed project and related new construction. Attach additional sheets as necessary. <br /> Emphasize construction, operation methods and features that will cause physical manipulation of the environment or will <br /> produce wastes. Include modifications to existing equipment or industrial processes and significant demolition, removal or <br /> remodeling of existing structures. Indicate the timing and duration of construction activities. <br /> The proposed project is an expansion of the existing mechanical wastewater treatment facility(WWTF)to meet the following <br /> design flows and loadings: <br /> Average Wet Weather Flow(AWW) 3.55 MGD <br /> Peak Hourly Wet Weather Flow(PHWW) 5.68 MGD <br /> www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br /> wq-wwtp2-20 • 8117112 Page 1 of 7 <br />