My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 07-02-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
07-02-2012
>
8.2. SR 07-02-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 9:05:25 AM
Creation date
6/28/2012 11:22:34 AM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stanfiec <br />CITY OF ELK RIVER -STORM WATER UTILITY <br />STORM WATER UTILITY <br />June 25, 2012 <br />3.3 NEW MS4 REQUIREMENTS <br />The MPCA has issued a revised MS4 permit that is currently out for public comment (started <br />May 21, 2012). The public comment period ends July 23, 2012. The new MS4 permit will be <br />effective September 2012. The revised rules will put addition requirements and strain on the <br />Storm Water Utility budget to comply with the minimum control measures. Below are a few of <br />the proposed revisions that will be included in the MS4 rules. <br />The City will be required to develop and implement a program to address Total <br />Maximum Daily Loads (TMDLs) with applicable Waste Load Allocation (WLA) <br />requirements. This means implementing programs and projects to reduce pollutant <br />loadings to selected impaired waters. <br />The City will be required to update mapping of all storm pipes 12 inches or greater in <br />diameter, including storm water flow direction in those pipes. Outfalls to receiving <br />waters (a total of 556 in Elk River) will need to be assigned a unique identification <br />number with an associated geographic coordinate. This task alone will put undue strain <br />on staff time and may need to be contract work. <br />At least three high priority storm water-related issues will need to be emphasized for <br />education and outreach, such as TMDL targets, changing business practices, promoting <br />adoption of residential Best Management Practices (BMPs), or lake improvements <br />through lake associations. <br />The City will be required to develop and implement aPost-Construction Storm Water <br />Management program that requires the use of any BMPs with highest preference given <br />to green infrastructure techniques and practices such as infiltration, evapotranspiration, <br />reuse/harvesting, conservation design, urban forestry, and green roofs. <br />The City will need to enforce no net increase from pre-project conditions for storm water <br />runoff volumes, total suspended solids (TSS), and total phosphorus (TP) on new <br />development projects. Redevelopment projects will be required to show a net reduction <br />for these same parameters. <br />The City will be required to develop a pond assessment schedule and procedures. The <br />assessment process will need to include schedules and procedures for determining the <br />TSS and TP treatment effectiveness for all City-owned ponds. <br />The City will be required to determine the watershed area, percentage of impervious <br />cover, permanent storage volume, and temporary water quality storage volume for each <br />City-owned pond (a total of 110). <br />The above requirements are just a short sampling of the new requirements in the draft MS4 <br />permit. A more complete list of requirements based on the draft MS4 permit is shown in <br />©ne Team.lnfinote Sa~utions. <br />Project No. 193802143 3.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.