My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.12. SR 06-17-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
06/17/2002
>
6.12. SR 06-17-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:31:49 AM
Creation date
6/14/2002 9:11:09 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/17/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mayor and City Council / CU 02-18 <br />June 17, 2002 <br />Page 2 <br /> <br />Overview <br /> <br />The request consists of a one-story 7,500 sq. ft. building. The entire building will be treated <br />with an Exterior Insulating Finish System (EIFS) and Rockface Concrete Masonry Units <br />(CMU). The floor plan of the building will consist of two tenant spaces. Tenant A will <br />consist of 2,572 square feet and Tenant B will consist of 4,800 square feet. <br /> <br />Building setbacks are not defined in the Elk River Crossing PUD but the building meets the <br />C3 zoning setbacks. <br /> <br />Design Standards <br /> <br />The bottom two-thirds of the facades will consist of glazing and 4" & 8" rock face CMU. <br />The upper one-third will be treated with EIFS. The entrances are clearly defined with metal <br />canopies and the there will be EIFS cornice work and CMU pilasters on the facades to break <br />Up the surface. The proposed design meets the design standards for Elk River Crossing. <br />The allowable signage, as defined by the Elk River Crossing PUD, is two wall signs per <br />principle building. They are proposing 3 signs per tenant, which exceeds the maximum <br />allowed. <br /> <br />A trash enclosure was not indicated on the site plan. The Elk River Crossing PUD states <br />"dumpsters should be within an enclosure constructed of the same materials and colors as <br />those used in the building." <br /> <br />Landscaping <br /> <br />The submitted landscape plan does not meet the City's requirements. There needs to be a <br />total of 22 trees: six conifers (which they meet), five ornamentals (which they exceed by <br />two) & 11 overstory trees (which they do not meet). They should provide five additional <br />overstory trees. <br /> <br />A monument sign has been indicated on the site plan near Zane Street which is not placed <br />10-feet from the property line. The location of the sign should be placed 10-feet from the <br />property line so as not to obstruct sight lines of vehicular traffic and it should be placed so <br />vehicle bumpers will not come in contact with it. <br /> <br />Parking and Circulation <br /> <br />Based on the square footage of the building and the City's requirement of one parking stall <br />for every 200 sq. ft. of floor area, a total of 38 parking stalls would be required. The <br />proposed layout exceeds this requirement with a total of 74 total stalls. The minimum 10' <br />setback from the property line is also maintained. <br /> <br />Three (3) handicap-parking stalls are required for the building. The submitted site plan does <br />not indicate any handicap-parking stalls. For parking lots with 51-75 stalls, there is a <br />minimum requirement of three accessible stalls. The site plan will need to be revised to <br />provide the required spaces. <br /> <br />S:\PLANNING\Case Files\CU 02-18 STM Development\CU02-18_CC.DOC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.