My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 12-15-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
12/15/2003
>
6.3. SR 12-15-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:15 AM
Creation date
12/12/2003 9:03:10 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/15/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Scott Hadicker <br />November 4; 2003 <br />Page Two <br /> <br />should include concrete pedestrian ramps for the existing sidewalk on each side of the new <br />driveway opening. <br /> <br />Water service is proposed to be achieved by providing a wet tap on the existing water line <br />located in the boulevard along Freeport Avenue and extending a six-inch water service to <br />the new building. Sanitary sewer service is shown to be provided from the existing <br />sanitary sewer line located on the south lot line. The connection indicates that there is an <br />existing service stub located along the existing sanitary sewer line to service this lot. Both <br />the sanitary sewer service and water service are appropriate for the proposed building. <br /> <br />An existing 12-inch storm sewer line crosses the lot. An existing catch basin apparently <br />will fall in the curb line of the new driveway. No storm sewer calculations have been <br />provided at this point in time. Storm sewer runoff calculations should be submitted to <br />indicate whether or not one catch basin is sufficient to pick up the runoff anticipated from <br />the site. We believe that the existing catch basin on the site and the existing catch basin <br />located on the ECM site have likely less capacity than needed for the runoff expected from <br />the new driveway and building rooftop. We anticipate the need to construct additional <br />catch basins with one located on the north side of the proposed driveway opening to pick <br />up runoff internally prior to reaching the driveway and flowing out onto Freeport Avenue. <br />The storm sewer calculations should be submitted and the grading plan modified to include <br />any additional catch basins shown to be needed. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br />Ter~J~. a~urer, P.E. <br /> <br />TJM:sw <br /> <br />Ltr-110403-Harlicker <br /> <br />Howard R, Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.