Laserfiche WebLink
Elk River . <br /> Municipal Utilities <br /> 13069 Orono Parkway <br /> P.O. Box 430 <br /> Elk River,MN 55330 <br /> (763) 441-2020 <br /> UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs <br /> John Dietz, Chair Line Superintendent <br /> Daryl Thompson, Vice Chair <br /> Al Nadeau, Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> February 12, 2013 6.1 <br /> SUBJECT: <br /> Staff Updates <br /> DISCUSSION: <br /> • Continue rebuilding the single phase overhead line on Viking Blvd. <br /> • Continue tree trimming. <br /> • Finished bypassing feeder reclosers for SCADA testing. <br /> • Had six new house services. <br /> • Finished making up the 4/0 primary loop on Business Center Drive. This wire was <br /> installed when the fiber cable was installed. <br /> • Continue fixing problems that the infrared camera finds. We have found bad overhead <br /> cutouts, secondary connections on three phase transformers and bad elbow arresters. <br /> • Changed out a three phase transformer at Cretex north mixing plant. <br /> • Working on testing the overhead and underground protective grounds. We are also <br /> testing the fiberglass hot sticks. Both of these are done annually. <br /> • We are looking at options to replace 17 high pressure sodium light fixtures with LED <br /> light fixtures on Evans Avenue by Menards. In addition to this, there were five light poles <br /> that need to be changed out because they were too rusty to get painted. <br /> I1'POEOEO 1I <br /> NATURE1 <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br />