My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 PCSR 02-12-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
02-12-2013
>
4.1 PCSR 02-12-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2013 12:11:15 PM
Creation date
2/7/2013 12:10:10 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/12/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File:CU 13-02 Bank of Elk River <br /> Page 2 230 Evans <br /> (—!COMMERCAIL RESIDENTIAL <br /> , jMQ <br /> 0 <br /> 4 <br /> r 1 l - <br /> i • <br /> SE)C5YL � <br /> Comprehensive Plan: The comprehensive plan for the parcel guides it as `old town',which the plan notes <br /> is a way to reflect"the need and opportunity for preservation,revitalization,renovation, and <br /> redevelopment." While residential uses in the old town district are permitted and in many areas <br /> appropriate, staff believes the intent of the Old Town designation with the C-2 zoning district is to evolve <br /> the area from residential to commercial uses,as driven by the market. <br /> Access: Access to the property is via Evans. To preserve the flow of traffic on Main, staff proposes a <br /> condition that no access onto Main Street be permitted. <br /> Conditional Use Permit: As with all Conditional Use Permit reviews, the Planning Commission and the <br /> City Council should determine if the residential use of the property satisfies the standards for a <br /> conditional use permit,in particular#3: Will not impede the normal and orderly development and <br /> improvement of surrounding vacant property. <br /> Singularly, the property is not of adequate size to accommodate commercial office development, due to <br /> market demands for office space,in addition to parking, and stormwater. Staff does not feel that <br /> converting the use to residential will impede the orderly development of the area. <br /> APPLICABLE REGULATIONS <br /> Conditional Use Permit <br /> The issuance of a Conditional Use Permit can be ordered only if the use at the proposed location: <br /> 1. Will not endanger, injure or detrimentally affect the use and enjoyment of other proper y in the immediate vicini <br /> or the public health, safey, morals, comfort, convenience or general welfare of the neighborhood or the ci y. <br /> 2. Will be consistent with the comprehensive plan. <br /> 3. Will not impede the normal and orderly development and improvement of surrounding vacant property. <br /> 4. Will be served adequately by and will not adversely affect essential public facilities and services including streets, <br /> police and fire protection, drainage, refuse disposal, water and sewer systems,parks and schools;and will not, in <br /> particular, create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. <br /> N:\Departments\Community Development\Planning\Case Files\CUP\CU 13-02 Bank of Elk River\CU 13-02 SR to PC 2-12-13.docc <br />
The URL can be used to link to this page
Your browser does not support the video tag.