My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 02-04-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
02-04-2013
>
7.1. SR 02-04-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2013 3:14:19 PM
Creation date
2/1/2013 10:19:35 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Justin Femrite <br /> December 4, 2012 <br /> Summary of Findings <br /> Several factors are considered when determining the number of pavement coresto be taken, including the <br /> pavement condition or visible distresses present on the pavement and the variability of the pavement depth <br /> asthe cores are being completed. Pavement coring identifies what exists under the visible layer oft he <br /> pavement and can give awealth of information including depths of the pavement layers, signs of bonding or <br /> unbonding and distresses that might not be visible from the road surface. <br /> In general the core samples taken had bituminous depths ranging in depth from 2 inchesto 6 inches. It was <br /> also found that the majority of the underlying material from the core samples taken was sand. Core 2 was in <br /> an area of deteriorated bituminous which was seen by visual inspection oft he surface and validated when <br /> the core broke up in the hole. There was some deterioration at the bottom of Core 5. Core 6, 7,8,9 and 10 <br /> had some underlying material that was either sandy clay or day. <br /> Cores 1 - 10 were taken on roads where full depth redamation with curb patching has been proposed. As <br /> was previously mentioned,the bituminous depths in these pavement cores ranged from 3 inchesto 6 inches, <br /> noting also a thinner base on Irving and 4t"Elreet. After reviewing the pavement cores,we support the <br /> recommendation of full depth reclamation with curb patching pointing out the fact that the existing base <br /> thicknesses highlighted along Irving and 4t"Elreet may lead to thinner bases in those areas pending on the <br /> pavement design. <br /> Cores 12 and 13 showed pavement still in sound condition. These roadsare being recommended to have a <br /> wear course placed on the unfinished development streets. We support this recommendation. <br /> Core 11 and Cores 14-20 were taken on roads where an overlay with an edge mill was proposed. Due to the <br /> sound quality of the cores along these roads,we support the recommendation for an edge mill and overlay <br /> along these roads. <br /> Cores 21 -23 were taken on roads where an overlay was proposed. The existing pavement along 202nd Greet <br /> is showing no serious signs of distress. Due to the thin bituminous depth along this street,we support the <br /> recommendation to do an overlay on this road. <br /> Minneapolisâ– St. Cloud <br /> Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.