My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 01-22-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
01-22-2013
>
10.1. SR 01-22-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2013 3:32:01 PM
Creation date
1/18/2013 10:58:21 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1—2013 Street Improvement Project <br /> Summary of Existing Street Conditions <br /> F <br /> 1liilth <br /> Length Sub-grade/ Avg.Bit. Year <br /> Street Name (tees) V rom To <br /> (feet) Deptb Section Constructed* <br /> east of Gates:3"- <br /> 4"aggregate/silty <br /> sand <br /> 3'd Sl 4et NW Irving Avenue west of Gates:7" <br /> (Reconstruct) 1600 30-39 NW Evan Avenue aggregate/sand � `1 <br /> west of Holt: <br /> silty sand(no <br /> aggregate) <br /> Irving Avenue <br /> NW 360 ,6 4`h Street NW 3`4 Street NW 3"base/sand 3" NIA <br /> (Reclaim) <br /> Holt Avenue No Boring No Coring <br /> (Overlay) 3N, - 4"Street NW 3`4 Street NW Information Information N/A <br /> Available Available <br /> Evans Avenue north d"base/sand to <br /> NW 1320 33 Main Street NW terminus 8"base/sand 3 1,to 3.5'1 N/A <br /> (Reclaim) <br /> ° Estimated date of base course pavement <br /> "* Edge of bituminous pavement to edge of bituminous pavement <br /> 2.3.2 Storm Sewer <br /> City record drawing information indicates that storm sewer facilities already exist within <br /> many of the 2013 Street Improvement Project areas. Historically,the existing storm <br /> sewer facilities throughout the majority of the 2013 Street Improvement Proicct area have <br /> proven adequate for drainage. <br /> No storm sewer currently exists along the following roadways: 202'1 Avenue NW, 185th <br /> Avenue NW, Business Center Drive, Gary Street, 4th Street, Railroad Drive, and 3rd <br /> Street NW. Roadways utilize existing ditch systems to convey storm water. Water <br /> ponding issues have not been identified by the City. <br /> 2.3.3 Writer Main <br /> The majority of the existing water main located within the 2013 Street Improvement <br /> Project area is in good condition and functions adequately with no water main breaks or <br /> freeze-ups identified by Elk River Municipal Utilities. <br /> 2.3.4 Sanitary Sewer <br /> The majority of the existing sanitary sewer located within the project area is in good <br /> conditions and does not warrant replacement_ <br /> Feasibility Deport <br /> 2013 Street Improvement Project <br /> City of Elk River MN <br /> WSB Project No.1992-01 Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.