My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 01-22-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
01-22-2013
>
10.1. SR 01-22-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2013 3:32:01 PM
Creation date
1/18/2013 10:58:21 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMERICAN ENGINEERING TESTING, INC. AET Project No. 2G-40538 <br /> For more information about subgrade preparation and design, please read the standard sheet <br /> entitled"Bituminous Roadway Subgrade Preparation and Design"at the end of this report. <br /> 6.2.2 Fill Placement and Compaction <br /> All fill should be placed and compacted per the requirements of Mn/DOT Specification <br /> 2105.3171 (Specified. Density Method). This specification requires soils placed within the critical <br /> subgrade zone be compacted to a minimum of 100% of the standard maximum dry unit weight <br /> defined in ASTM: D698 (Standard Proctor test), at a water content 65%to 102% of the standard <br /> optimum water content. A reduced minimum compaction level of 95% of the standard maximum <br /> dry unite weight can be used below the critical subgrade zone. The sand subbase layer can be <br /> considered part of a composite subgrade; and the trip of the subbase can be figured as the top of <br /> the 3 foot subgrade zone needing the 100% compaction level. Compaction of the fill should be <br /> performed with equipment that will provide the recommended compaction levels through the <br /> entire lift. <br /> 6.2.3 Subgrade Stability and Test Doll <br /> Subgrade stability within the critical subgrade zone is important for pavement support, <br /> construction and performance. With the 12-inch sand subbase layer comprising the upper foot <br /> of the critical subgrade zone,the existing soil portion(or new fill, if needed) will then comprise <br /> the lower 2-feet of the critical subgrade zone for the existing embankments. Stability of these <br /> existing subgrade soils should be evaluated, preferably using the test roll procedure, before <br /> placement of the sand subbase layer. <br /> 6.3 Estimated R-Value <br /> The limiting soils within the critical subgrade zone are the silty sands. These soils have an <br /> estimated R-value of 20. This estimate'is based on Table 5-3.3(a) within the 2007 Mn/DOT <br /> .Pavement Manual and our experience. <br /> Page 6 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.