Laserfiche WebLink
the WHP area, DWSMA, and the vulnerability assessments and the meetings of the WHP <br /> protection team were open to the public. Also, a public hearing was held before the completed <br /> WHP plan was sent to MDH for state agency review and approval. The following issues were <br /> identified during comment periods— <br /> Table 5—Issues,Problems and Opportunities <br /> Problem Associated Adequacy of <br /> Impacted with the Identified Opportunity Associated Existing Controls to <br /> Issue Identified Feature with the Identified Issue <br /> Issue Address the Issue <br /> The ERMU can partner with The ERMU does not <br /> There are likely Aquifer The ERMU needs to Sherburne County&SWCD to have authority to require <br /> numerous unused Well Water assess which wells help property owners pay for that unused wells be <br /> and unsealed wells Quality present a threat to the the costs of properly sealing properly sealed. <br /> on residential DWSMA aquifer based upon their unused wells. <br /> &commercial (Select all depth,construction,and The MDH has grant programs The MDH has authority <br /> properties that apply.) state of repair available to assist with the to require well sealing <br /> sealing of wells <br /> No jurisdiction for a ERMU will work closely with County presently has <br /> Aquifer small number of the numerous jurisdictions on zoning and building <br /> DWSMA DWSMA <br /> boundaries extend properties located within land use decisions outside permit jurisdiction over <br /> Well Water and outside the ERMU's jurisdiction. the DWSMA located <br /> past ERMU limits Quality <br /> DWSMA. outside ERMU limits. <br /> At the present time the <br /> ERMU,local and state <br /> governments have <br /> existing controls in place <br /> The ERMU to address most issues as <br /> recognizes this is a they occur. Some issues <br /> 10 year plan and The ERMU has the are uncontrollable and <br /> that issues, Aquifer The ERMU needs to opportunity to work with other unforeseen and <br /> problems,and DWSMA have the flexibility to local units of government to additional controls might <br /> opportunities can Well Water address changing address those issues, problems need to be considered to <br /> change from today Quality situations and opportunities that may address new issues. The <br /> which can impact change over the next 10 years. ERMU local and state <br /> the implementation governments are <br /> strategies continually updating land <br /> use controls as new <br /> issues,new problems and <br /> new opportunities occur. <br /> The ERMU has With limited resources ERMU will form working ERMU has limited time <br /> limited resources to the implementation of partnerships with local units of and resources for <br /> implement all of the the WHP Plan will be a government and state agencies implementation. <br /> management DWSMA challenge to the ERMU. that have regulatory authority <br /> strategies contained and/or programs to help with <br /> within this WHP implementation. <br /> plan <br /> New high capacity Aquifer The ERMU has no The ERMU will keep updating The ERMU will need to <br /> wells drilled within DWSMA authority over the land use controls to allow the work closely with MDH <br /> the DWSMA or one Well Water construction and ERMU the authority over the and the MN Dept of <br /> mile of the Quality pumping rates for newly construction of high capacity Natural Resources of <br /> 8 <br />