My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.7. ERMUSR 01-08-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
01-08-2013
>
2.7. ERMUSR 01-08-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2013 12:25:01 PM
Creation date
1/16/2013 12:24:59 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br /> Energy Management Rates <br /> Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br /> Applicable: To single family residences, non-demand and demand customers when all service is <br /> supplied through a single meter. <br /> Dual Fuel Space Heating Rate: A dual fuel space heating system consists of a primary electric <br /> heating system and a secondary non-electric space heating system both capable of heating a <br /> structure at design conditions. Interruptions of the primary system will usually occur for up to 12 <br /> hours daily on peak winter days and a maximum of 400 hours per heating season. <br /> To qualify for the special rate, the customer shall provide: <br /> 1. A primary electric space heating system which can be interrupted by a single 5 amp rated <br /> relay. <br /> 2. A secondary non-electric space heating system capable of automatic start-up and <br /> continuous operation upon interruption of the primary system. <br /> 3. Obtain a load control device furnished by ERMU. <br /> 4. Accommodations for a meter and load control device and associated wiring installed <br /> according to the applicable electrical codes, and installed by a qualified electrician. <br /> 5. Inspection by a State certified electrical inspector and a representative of ERMU. <br /> Elk River Municipal Utilities shall provide: <br /> 1. All electric energy consumed by the primary electric heating system at$.0499 per KWH. <br /> 2. During peak load conditions, ERMU will turn customer controlled electrical heat off for <br /> extended periods of time as stated above. <br /> 3. A meter to measure electricity consumed by the primary electric heating system. <br /> 4. A load control device and meter socket to accommodate the meter. <br /> Electric Vehicle Charging Rate: This Program is available to all residential customers of ERMU <br /> that own an electrically powered vehicle used for on road transportation. Charging of the vehicle <br /> may be interrupted up to 12 hours per day not to exceed 600 hours in a year. <br /> To qualify for the special rate, the customer shall provide: <br /> 1. Electric vehicle charging station that is used for the sole purpose of charging electric vehicles. <br /> This charging station may be 120/240 volt. <br /> 2. Customer is responsible for installation of load control device and meter socket in a mutually <br /> agreed upon location. <br /> 3. Inspection by State Certified electrical inspector of all metering equipment and provide an <br /> affidavit to ERMU when completed. <br /> Elk River Municipal Utilities shall provide: <br /> 1. Load control device and metering equipment to customer. <br /> 2. Final inspection prior to meter activation to ensure only qualified loads are being supplied <br /> through the electric vehicle charging equipment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.