My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 PCSR 01-08-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
01-08-2013
>
4.1 PCSR 01-08-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2013 1:10:24 PM
Creation date
1/4/2013 3:19:04 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File:CU 13-01 Cornerstone Conditional Use Permit <br /> Oil Change express <br /> Page 3 <br /> Utilities <br /> No changes to the utilities are proposed. <br /> Landscaping <br /> Landscaping was proposed as part of the 2006 submittal, and was a condition of approval for the 2012 <br /> approval. No changes are suggested, although a site inspection will be completed to ensure all trees are <br /> still living in the spring. <br /> ATTACHMENTS <br /> • Location Map <br /> • Applicant's Narrative <br /> • Overall Floor Plan dated November 26, 2012 <br /> Action Motion by Second by Vote <br /> Follow Up <br /> N:\Departments\Community Development\Planning\Case Files\CUP\CU 13-01 Cornerstone oil change\CU 13-01 ER Cornerstone SR to PC 1-8- <br /> 13.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.