My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 01-07-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
01-07-2013
>
9.1. SR 01-07-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2013 8:47:10 AM
Creation date
1/4/2013 8:26:48 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/7/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. FEASIBILITY AND RECOMlVIENDATION <br /> The following improvements are recommended to be constructed as part of the 2013 Street <br /> Improvement Project: <br /> ➢ A 11/2-inch wear course paving along the following streets: <br /> • Lincoln Street NW located within the Eagle Marsh neighborhood <br /> • Dodge Street NW located within the Hillside Estates 10th Addition <br /> • Vance Street NW located within the K& L Addition <br /> • Local streets within The Woods at Hillside 4th Addition <br /> ➢ An edge mill and bituminous overlay with spot curb and gutter replacement along the <br /> following streets: <br /> • Local streets within the Country Side Acres neighborhood <br /> • Highway 10 Frontage Road located within the Avon Acres 4th Addition <br /> • Carson Street NW located within the Deerfield 4th Addition <br /> • Local streets within the Meadowvale Heights neighborhood <br /> • Holt Avenue NW located between 41h Street NW and 3rd Street NW <br /> ➢ Bituminous pavement reclamation with spot curb and gutter replacement along the <br /> following streets: <br /> • Local streets within the Royal Oaks Ridge neighborhood <br /> • Evans Avenue NW located between Main Street NW and the north terminus <br /> • 4th Street NW located between Jackson Street NW and Gates Avenue NW <br /> • Irving Avenue NW located between 4th Street NW and 3rd Street NW <br /> ➢ Full street and utility reconstruction along the following streets: <br /> • 185th Avenue NW located between Troy Street NW and Naples Street NW <br /> • Business Center Drive located between Joplin Street NW and Gary Street <br /> • Gary Street located between Business Center Drive and State Highway 10 <br /> • Lowell Avenue NW located between Railroad Drive and King Avenue <br /> • 4th Street NW located between King Avenue and Jackson Avenue NW <br /> • Railroad Drive located between Jackson Street NW and Main Street NW <br /> • 3rd Street NW located between Railroad Drive and Evans Avenue NW <br /> ➢ Replacement and repair of structurally deficient sewer and manholes as identified by the <br /> City's Public Works Department <br /> The total estimated cost for the 2013 Street Improvement Project including roadway, sanitary <br /> sewer, water main, and storm sewer improvements is $3,685,805.20. Proposed funding for the <br /> project is provided through a combination of Special Assessments, City funds, and Elk River <br /> Municipal Utility funds. <br /> Feasibility Report <br /> 2013 Street Improvement Project <br /> City of Elk River,MN <br /> WSB Project No.1992-01 Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.