My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 01-07-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
01-07-2013
>
9.1. SR 01-07-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2013 8:47:10 AM
Creation date
1/4/2013 8:26:48 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/7/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4.4 Sanitary Sewer Improvements <br /> Additional analysis will be completed during final design to identify sanitary sewer <br /> rehabilitation necessary along existing trunk sanitary sewer facilities to extend the life of <br /> the existing facilities until such time as they can be replaced with future road <br /> reconstruction projects. The City will be televising sanitary sewer within the proposed <br /> project areas during the winter of 2012/2013. <br /> As was described above with the proposed Water Main Improvements, sanitary sewer <br /> services were discussed at the neighborhood meeting on December 13, 2012, for the <br /> properties that have frontage on 185th Street. Sanitary sewer is not immediately available <br /> for this area and therefore they were not included as part of this feasibility study. <br /> Appendix F includes an exhibit and cost estimate to add sanitary services to this project. <br /> 2.4.5 Mailbox Replacement <br /> Where existing curb and gutter replacement and new curb and gutter is proposed, it is the <br /> City's intent to salvage and reinstall the existing mailboxes and mailbox supports that <br /> may be impacted with construction <br /> 2.5 Permits/Approvals <br /> An NPDES permit for construction activity will be required since more than one (1) acre will be <br /> disturbed by construction activities with the project. <br /> A permit from the Minnesota Department of Health (MDH)will also be required for the <br /> installation and replacement of water main facilities along 185th Avenue NW, 4d' Street NW, and <br /> 3rd Street NW. <br /> A permit from MnDOT for drainage changes and potentially traffic control related to the Gary <br /> Street. <br /> 2.6 Construction Traffic <br /> The contractor will be responsible for providing access to all properties throughout the project. <br /> Adequately signed detours will be identified to direct traffic around the construction zones and <br /> notify users of the increased truck and construction activity. <br /> Construction will be phased so as to reconstruct the streets located at the center of the project <br /> first, such that construction truck traffic will not need to access newly reconstructed streets to <br /> complete the project. Detailed construction phasing plans will be developed with final design of <br /> the project. <br /> Feasibility Report <br /> 2013 Street Improvement Project <br /> City of Elk River,MN <br /> WSB Project No.1992-01 Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.