My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 12-13-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
12-17-2012
>
8.2. SR 12-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2012 8:24:28 AM
Creation date
12/13/2012 4:13:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/17/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2013 thru 2017 <br /> City of Elk River, Minnesota <br /> Project# WW-26 <br /> Project Name Effluent Reuse Project <br /> Type Improvement Department Sewer Department <br /> Useful Life Unassigned Contact Engineer <br /> Category Buildings Priority n/a <br /> Description <br /> This project involves the study of reusing the effluent water from the City WWTF by Great River Energy in some of their plant processes. The <br /> project costs include the preliminary engineering work and associated construction costs to pump the water from our facility to Great River Energy. <br /> Justification <br /> Reuse by product which would other wise be a waste output from the WWTF <br /> Expenditures 2013 2014 2015 2016 2017 Total <br /> Construction/Maintenance 571,500 571,500 <br /> Total 571,500 571,500 <br /> Funding Sources 2013 2014 2015 2016 2017 Total <br /> Sewer Fund 285,750 285,750 <br /> State grants 285,750 285,750 <br /> Total 571,500 571,500 <br /> 2013-2017 CAPITAL IMPROVEMENT PLAN Page 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.