Laserfiche WebLink
Capital Improvement Plan 2013 thru 2017 <br /> City of Elk River, Minnesota <br /> Project# IA-02 <br /> Project Name Ice Arena Major Building Repair • <br /> Type Building Department Ice Arena <br /> Useful Life 20 years Contact Ice Arena Manager <br /> Category Building Maintenance Priority n/a <br /> Description <br /> 2013 projects include: <br /> Replace Barn roof($113,300) <br /> Barn dehumidifier($180,000) <br /> Desicant wheel on olympic dryer($64,000) <br /> Justification I <br /> The Barn's roof was installed in the early 70's and is well past its life expectancy. The arena is starting to experience several leaks on the south <br /> end. <br /> The interior of the Barn structure will continue to deteriorate without a dehumidifier that is sized correctly for the Barn. <br /> The desiccant wheel on the dehumidifier is starting to deteriorate and is falling apart. <br /> Expenditures 2013 2014 2015 2016 2017 Total <br /> Building Maintenance 357,300 357,300 <br /> Total 357,300 357,300 <br /> Funding Sources 2013 2014 2015 2016 2017 Total <br /> Ice Arena 357,300 357,300 <br /> Total 357,300 357,300 <br /> 2013-2017 CAPITAL IMPROVEMENT PLAN Page 16 <br />