My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 06-10-2002
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2002
>
06/10/2002
>
5.2. SR 06-10-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:31:49 AM
Creation date
6/14/2002 7:51:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/10/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LANDSCAPING REQUIREMENTS <br /> FOR OTHER CITIES <br /> <br />Rogers-(763) 428-2253-$2500 escrow to city for sod or seed and $3000 if a corner lot all <br />lots require four (4) trees. <br /> <br />Monticello-(763) 295-2711 <br /> <br />Champlin-(763) 421-2629-$1000 sod, $100 for 2 trees, $1500 for as-built if no final <br />grade at final, and $750 for drivexvay <br /> <br />Maple Grove-(763) 494-6060-They have a Grading Inspector/Bldg. Dept. does not <br />monitor-Developers agreement for $200 each lot for tree and boulevard sod and before <br />plat is ok'd and money is not released until done. Corner lots $350 <br /> <br />Ham Lake-(763) 434-9555- Front needs to be sodded and/or seed with 4" of black dirt- <br />Different escrows depending on date of project.-If erosion control not up all inspections <br />stop for that house until up. Cash deposit to be determined by City Council-Driveways <br />$2250 escrow <br /> <br />Andover-(763) 755-5100 Have until May 1st to get sod in/escrow depends on size of lot <br />(right noxv $160-$900 (but person said they would like to raise) If not done by June t st <br />letters sent to get done-S1500 for final grade(as-built)/driveway/steps, etc. They have to <br />do 15' of boulevard also <br /> <br />Blaine-(763) 784-6700-Escrow varies due to size of lot and if they do not do sod, hydro <br />seding is only other alternative but they must also have irrigation system in-Trees are <br />$250 each <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.