My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 11-24-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
11/24/2003
>
5.3. SR 11-24-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:15 AM
Creation date
11/24/2003 3:35:03 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/24/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Municipal Liquor Store <br />The municipal hquor store is a very important £mancial resource for the city. For the past ten years <br />the city has transferred about $38,000 per year out of the liquor store fund to help finance the 1993 <br />city hall project. This xvill continue until the debt is paid off. Additionally, in 2004, the city will <br />transfer $195,000 from the liquor store to the general fund to help £mance general municipal <br />services. This transfer amount was $120,000 in 2002. This is a substantial increase in just two years <br />and shows in part the financial importance to the city for having the municipal liquor store. <br /> <br />In addition to the contribution to the city hall debt payment and to the general fund, the City <br />Council has recently used funds from the municipal liquor store for two special projects. One <br />project was helping with the expenses associated with the gun range in the new pubhc safety <br />building. This is expected to be about a $120,000 expenditure. The second special project was <br />helping to fund the new ice rink floor in the Barn. This is expected to be about a $220,000 <br />contribution from the liquor store. Annually, the liquor store makes about $350,000 net profit; so <br />about one year's annual profit is being spent on these t~vo special projects. <br /> <br />An item which the City Council will need to discuss at some point is the possibility of a second store <br />which we have generally referred to as Westbound. This issue does not have to be decided at this <br />time; however, it should be noted that $8,000 is in the 2004 budget for a feasibility study. The last <br />feasibility study was done in 2002. After evaluation of that feasibility study, the Council decided to <br />not proceed with the second store. Options for the City Council include doing another study, <br />foregoing a study and simply doing the project, or leaving well enough alone and waiting to consider <br />a study or project in 2005 or 2006. <br /> <br />Wastewater Treatment System (WWTS) <br />One of the highlights of the 2004 WWTS budget is the proposal to add another full time employee. <br />This need was noted last year ~vhen the 2003 budget was presented. Growth in the system and <br />additional responsibilities as it relates to lab work and the lift stations is generating the need for this <br />employee. It is the intent that, with an additional employee added to the department, one employee <br />will take the lead responsibility in the lift stations program. <br /> <br />In 2003, the city entered into a contract for the hauling of the sludge from the plant to the sludge <br />spreading site on 165th Avenue. This was an important safety issue for the city and everything went <br />very well in 2003. The city will continue this program in 2004 and will evaluate expanding this <br />contract into other sludge related work in the future. <br /> <br />There are two significant capital improvements that are planned in 2004 that are not in the operating <br />budget. Please see the attached memo from Terry Maurer regarding these two capital improvements. <br />One item is the digester cover which has been discussed for a number of years and which is in the <br />CIP. This is an approximately $500,000 expenditure and money for this project is in the WWTS <br />fund balance. Both Gary Leirmoe and Terry Maurer feel that we should not wait any longer ~vith this <br />project. The second item is somewhat new. This issue relates to the head works equipment that was <br />installed in the 1970s. The head works is where the major pipes from the lift stations enter into the <br />sewer plant. This equipment was not upgraded ~vith the plant expansion in the 1990s as it was still <br />functioning well. We are now starting to see some sewer flow problems and we need to expand and <br />upgrade this part of the plant. At this time we are not sure of the scope of the project and we need <br />the City Council to authorize the project so that a preliminary design report can be completed and <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.