Laserfiche WebLink
TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br />MEMORANDUM <br /> <br />Pat Klaers <br /> <br />Phil Hals <br /> <br />November 14, 2003 <br /> <br />Update on the Bailey House <br /> <br />Terry Zajac and I made a recent inspection tour of the Bailey House and would like to recommend the <br />following: <br /> <br />· New floor coverings on both levels <br />· Replace basement shower stall <br />· Replace damaged sheet rock and paneling <br />· Add eave troughs to south side of house <br />· Remove overgrown shrubbery <br />· Remove screen building on southeast lot corner <br /> <br />The first 3 items would be contracted out and City staff would do the last 3 items in the spring of <br />2004. <br /> <br />General clean-up, painting and foundation plantings could be done by the renter with city supervision. <br /> <br />Cost estimates for the contract work are: <br /> <br />Remove and replace the shower <br />Remove and replace damaged sheetrock & paneling <br />Remove and replace floor covering, main floor <br />Lower level <br /> <br />$1,250.00 <br /> 750.00 <br /> 2,250.00 <br /> 1,750.00 <br /> <br />TOTAL: $6,000.00 <br /> <br /> <br />