Laserfiche WebLink
COCO <br /> MUSILT <br /> MY PROJECT <br /> Nano Spectrum High School <br /> ---- Location: Elk Rlver,MN <br /> EQUIPMENT LAYOUT <br /> S2 1._Ur 147 <br /> I INCLUDES: <br /> `� a1 •lootbcll <br /> 4.4 Electrical System Requirements:Refer to Amperage <br /> k I Draw Chart and/or the"Musco Control System Summary" <br /> for electrical sizing. <br /> J Installation Requirements:Results assume 0/-3% <br /> �� nominal voltage at line side of the ballast and structures <br /> _i8981 - located within 3 feet(lm)of design locations. <br /> EQUIPMENT UST FOR AREAS SHOWN <br /> TON Miff S__ <br /> 2 Sl-S2 70 70' 1500W M2 9 <br /> -..... OD 2 53.54 70' 70' 1500W M2 10 <br /> 4 -� �..._T.Tn'..:... ...-___.. <br /> 3c <br /> SINGLELUMINAIREAMPERAs r 1 <br /> Ballast Specifications Line Amperage Per turnloairo <br /> Taosslnee.vt.nwl {moors. <br /> T <br /> Single Phase Volt age 206 220 240 277 347 380 480 <br /> 18/1 ISO tp 03 1W MI Po.. <br /> ISon watt MZ 8.6 8.3 75 65 5.1 - 37 <br /> 41P <br /> Si 1 ---;' <br /> 147 14S <br /> I I I I ENGINEERED DESIG m..-_ _______ <br /> Or Shawn Moyer <br /> SCALE IN FEET 1:80 Fee a/Date. 135909-40FC 24-oct-12 <br /> Pole location(s){-dimensions are relative <br /> to 0,0 reference point(s) Not to be reproduced in whole or part without the...often consent of Musco <br /> 0 80 3133' Spuds Lighting.LLC.0 1381,20i2 Muxu SPsoto Liyh1Iry,LLC. <br /> EQUIPMENT LAYOUT <br />