Laserfiche WebLink
Elk River Municipal Utilities <br /> 2013 Fees <br /> Proposed <br /> Proposed I Proposed <br /> Fee Description 2012 2013 Increase <br /> 1 New Residential Electric Connection-Developer-Lot with ERMU water service $ 450.00 $ 450.00 <br /> 2 New Residential Electric Connection-Developer-Lot without ERMU water service $ 550.00 $ 550.00 <br /> 3 New Residential Electric Connection-Builder $ 850.00 $ 850.00 <br /> 4 New Commercial&Industrial Electric Connection 50% 50% <br /> 5 Service Upgrades for Existing Commercial&Industrial Customers 100% 100% <br /> 6 Minimum Temporary Electric Service Fee-Existing Transformer $ 150.00 $ 150.00 <br /> 7 Minimum Temporary Electric Service Fee-Without Existing Transformer $ 500.00 $ 500.00 <br /> 8 Disconnect Fee-Residential $ 50.00 $ 50.00 <br /> 9 Disconnect Fee-3 Phase $ 150.00 $ 150.00 <br /> 10 Meter Tampering Fee $ 250.00 $ 250.00 <br /> 11 <br /> _ 12 <br /> 13 Residential Water Connection Per Plumbing Unit $ 3,060.00 $ 3,121.20 2% <br /> _ 14 Commercial Water Connection Per Plumbing Unit $ 3,060.00 $ 3,121.20 2% <br /> 15 Abandoned Water Service $ 2,500.00 $ 2,500.00 <br /> 16 Bulk Water Sales-Access Card Deposit $ 5.00 $ 5.00 <br /> 17 Bulk Water Sales-Units(per 1000 gallons) $ 4.00 $ 4.00 <br /> 18 Hydrant Water Sales-Rental $ 150.00 $ 150.00 <br /> 19 Hydrant Water Sales-Units(per 1000 gallons) $ 4.00 $ 4.00 <br /> 20 Water Shut-Off Fee $ 100.00 $ 100.00 <br /> 21 <br /> 22 <br /> 23 NSF Fee $ 20.00 $ 20.00 <br /> 24 Red Tag Handling Fee $ 20.00 $ 20.00 <br /> 25 <br /> 26 <br /> 27 Billable Cost of Materials Markup 15% 15% <br /> 28 Billable Labor Markup 55% 55% <br /> 29 Billable Vehicle/Equipment-Line Truck(per hour) $ 50.00 $ 50.00 <br /> 30 Billable Vehicle/Equipment-Pick-up Truck(per hour) $ 25.00 $ 25.00 <br /> 31 <br /> 32 <br />