Laserfiche WebLink
Planning Commission Minutes Page 10 <br /> April 11,2006 <br /> 2. THE PROJECT WILL BE COMPLETED IN PHASES. <br /> • PHASE ONE WILL INCLUDE ALL THE SITE WORK <br /> INCLUDING ALL PAVING AND CURBING,REMOVING THE <br /> HIGHWAY 10 ACCESS AND CONSTRUCTING THE TWO NEW <br /> ACCESS DRIVES; STORMWATER PONDING; SIGNAGE; <br /> CONSTRUCTION OF THE SERVICE ADDITION ON THE <br /> SOUTH SIDE OF THE BUILDING,AND CONSTRUCTION OF <br /> THE CARWASH/DETAIL CENTER. <br /> • PHASE TWO WILL INCLUDE THE ADDITIONAL OFFICE <br /> SPACE AND SHOWROOM. <br /> • PHASE THREE WILL INCLUDE THE PARTS AREA AND <br /> SERVICE ADDITION. <br /> 3. THE AREA INCLUDED IN PHASE I WO AND THREE SHALL BE <br /> GRADED AND SEEDED;NO PARKING WILL BE ALLOWED IN THIS <br /> AREA. <br /> 4. SINCE THE PROJECT IS PROPOSED TO BE COMPLETED IN <br /> PHASES, THE APPROVAL FOR THE CONDITIONAL USE PERMIT <br /> SHALL BE EXTENDED TO 2010. <br /> 5. THE EXISTING ACCESS FROM HIGHWAY 10 SHALL BE REMOVED. <br /> 6. BECAUSE THE APPLICANT IS PROPOSING TO UTILIZE LOW <br /> IMPACT DESIGN TECHNIQUES TO MANAGE STORMWATER, CURB <br /> AND GUTTER WILL ONLY BE INSTALLED IN AREAS TO CONTROL <br /> RUNOFF AND CUSTOMER TRAFFIC. <br /> 7. THE EXISTING HOME SHALL BE REMOVED. <br /> 8. PER SEC.30-859 NO SIGNAGE AND/OR DECORATIONS OF ANY <br /> TYPE, SUCH AS BUT NOT LIMITED TO, BANNERS, PENNANTS, <br /> FESTOONS,PAINTED WINDOWS AND BALLOONS SHALL BE <br /> ALLOWED ON THE VEHICLES.NO TEMPORARY SIGNS SHALL BE <br /> ALLOWED EXCEPT AS PERMITTED UNDER SEC.30-866(7). <br /> 9. A LETTER OF CREDIT IN THE AMOUNT OF$50,000 SHALL BE <br /> PROVIDED PRIOR TO ISSUEING THE GRADING OR BUILDING <br /> PERMITS. <br /> 10. PARKWAY STYLE LIGHTING AT THE ENTRANCES SHALL MEET A <br /> MIMIMUM CLASSIFICATION OF SEMI CUT-OFF. <br /> MOTION CARRIED 7-0. <br /> 6. • • • ess <br /> r <br /> 6.1. Update on Mar . • -••. ; Co_• -er . <br /> Commissio.. , .. erson provided an up•c _- . - March 20,2006 City Council <br />