Laserfiche WebLink
City Council Minutes Page 14 <br /> Apv117,2006 <br /> 10. THERE SHALL BE A MINIMUM CLASSIFICATION OF SEMI CUT- • <br /> OFF LIGHTING FIXTURES INSTALLED. <br /> MOTION CARRIED 5-0. <br /> Easement Vacation <br /> MOVED BY COUNCILMEMBER MOTIN AND SECONDED BY <br /> COUNCILMEMBER FARBER TO ADOPT RESOLUTION 06-43 FOR <br /> VACATING DRAINAGE AND UTILITY EASEMENTS, CASE NO. EV 06-0L <br /> MOTION CARRIED 5-0. <br /> The Council took a 10 minute recess at 8:10 p.m. <br /> 6.13. •esolution to Vacate Portion of Perpetual Bank Protection Maintenance Easement Pu• . <br /> He... .•-Case No.BV 06-02 <br /> Mr.Harlick, tated an easement to protect the bank along the Mississippi Riv-.m eeds to be <br /> vacated as it en -.ches in the building area of the Bluff Block in the downt.-•• <br /> revitalization projec - ea.Mr.Harlicker stated the easement is supersede.'•y the Wild and <br /> Scenic ordinance and •• not interfere with the protection of the riv <br /> Mayor Klinzing opened the • .1k hearing.There being no one t• peak to this issue, Mayor <br /> Klinzing closed the public b .. • <br /> • <br /> MOVED BY COUNCILMEMBE• ARBER AND, CONDED BY <br /> COUNCILMEMBER MOTIN TO OPT RE UTION 0644 FOR <br /> VACATING A PERPETUAL BANK P' •TE r ION MAINTENANCE <br /> EASEMENT, CASE NO. EV 06-02.MO '' CARRIED 5-0. <br /> 6.14. School Street/High School Parking Lot Sit'alizatio r :id Award <br /> Mr. Maurer stated bids have been sec; ed for the School .eet/High School parking lot <br /> signalization improvement project. .'e stated the low bid • •om Design Electrical <br /> Contractors in the amount of$ , ,077.Mr.Maurer further sta • overhead is estimated at <br /> 20 percent,resulting in a to. .roject cost of$176,492.40. <br /> MOVED BY COUN EMBER FARBER AND SECONDE■ :Y <br /> COUNCILMEMB MOTIN TO ADOPT RESOLUTION 06-45 CEPTING <br /> BID AND AUT •RIZING EXECUTION OF CONTRACT IN T MATTER <br /> OF THE SCH' •L STREET/HIGH SCHOOL PARKING LOT <br /> SIGNAL ON IMPROVEMENT OF 2006.MOTION CARRIED 5-0: <br /> 6.15. SAv . u •_..d•rU••.t <br /> Mr .urer presented a cost and land acquisition analysis of the four possible options for <br /> d Avenue to continue from TH 169 as an east/west corridor to CSAH 13. He reviewed <br /> .ow land acquisition,temporary grading easements,building removal,relocation costs,and • <br /> road construction costs would affect each option. He stated Option 4 is least likely to <br />