My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-13-2012 CCM
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2010-2019
>
2012
>
08-13-2012 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2012 9:02:26 AM
Creation date
9/26/2012 8:58:56 AM
Metadata
Fields
Template:
City Government
type
CCM
date
8/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes <br />August 13, 2012 <br />6.3 Ice Arena Renovation Options <br />isIce Arena Manager Rich Czech introduced Tom Betti of 292 Design Group. Mr. Betti <br />reviewed four options for renovation of the existing ice arena for the Council to consider, as <br />follows: <br />Option 1: Cost is approximately $4.2 million. Reflects current CIP — If roof leaks and <br />dehumidification in Barn Rink are not addressed, life expectancy is projected for 9 -12 years. <br />Option 2: Cost is approximately $4.9 million (Initially $1.2 million; additional $3.7 million in <br />10 years to replace refrigeration system). Maintain essential systems; would buy time before <br />major improvements must be made. Short term fix; does not address immediate or future <br />needs. <br />Option 3: Cost is approximately $6.9 million. Addresses repairs for long -term operations; <br />foundation for future needs. Includes new roof, dehumidification; expansion of locker <br />rooms in barn rink; enhanced lobby, replaces refrigeration in Olympic rink, which would <br />accommodate barn rink in future to significantly improve arena's efficiency. <br />Option 4: Cost is approximately $9.3 million. Replaces barn structure; adds new locker <br />rooms; expands lobby to accommodate both rinks; team lockers replaced with larger <br />updated rooms with improved air quality; new upper level lobby with concessions, storage, <br />restrooms and meeting rooms; replacement and centralization of both ice plants and HVAC <br />systems with state -of -the art equipment (address dehumidification). <br />Discussion followed regarding: <br />• • History of original barn rink and the Olympic rink <br />• What the city's role /responsibility is in financing the renovations <br />• Costs of renovations <br />• Commitment /responsibility of users (i.e. School District, skate groups, Youth <br />Hockey) <br />• Additional operating costs with the proposed renovations <br />• Number of hours of ice time for city programming, and hours billable to other <br />groups <br />• Advantages of multi -use facility to generate income (field house, community rooms, <br />meeting space for private and public organizations) <br />• Possible financing scenario <br />• Other possible sources of income generation (gate fees, concessions) <br />• Option of tearing down barn rink, leaving the Olympic rink <br />• Usage by the school district and their lack of interest in financial participation <br />Mr. Czech stated that currently, enough revenue is generated to cover operating costs. <br />Discussion followed regarding the need for a meeting with all stakeholders (users). Mayor <br />Dietz asked that staff provide more information regarding costs, possible income generating <br />options, and other costs associated with a renovation project (increased staff and utility <br />costs). <br />• <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.