My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 09-17-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
09-17-2012
>
7.2. SR 09-17-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2012 12:02:42 PM
Creation date
9/14/2012 9:06:04 AM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File: CU 12 -16 <br />Page 3 <br />Spectrum High School CUP addition <br />The project will include the removal of spaces to accommodate the expansion, and the construction of a <br />new parking lot into the soccer field. The new parking lot will include at least 38 parking spaces. <br />Landscaping, The new parking lot will require landscaping improvements, to comply with recent changes <br />to the City's landscaping regulations. <br />The applicant has not noted any objections to these requirements, and a complete plan submittal will be <br />available for the City Council meeting. These requirements were covered in the staff comment letter <br />dated August 13 ", 2012. <br />Staff did suggest that the parallel parking stalls be removed near the addition, as staff expects that to be <br />prone to misuse: vehicles are likely to park head in, rather than parallel, into the fire code required 20 foot <br />drive aisle. The applicant did not elect to pursue this recommendation as the encroachment into the <br />soccer field would be too drastic, limiting their use of the field. Misuse of the parallel spaces may result in <br />enforcement of the fire lane. <br />Utilities <br />The City engineer noted that there is a water main looped around the building. This water main may not <br />be located within the confines of the building. <br />ATTACHMENTS <br />■ Location Map <br />' Memo from staff dated August 13, 2012 <br />■ Applicant's Narrative <br />■ Site Plan dated July 30, 2012 <br />■ Architectural Drawing dated July 30, 2012 <br />Action Motion by Second by Vote <br />Follow Up <br />N: \Departments \Community Development \Plazuung \Case Files \CUP \CU 12 -16 Spectrum \CU 12 -16 SR to PC Sprectrum Addition 9- 11- 12.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.