Laserfiche WebLink
REQUEST FOR ACTION <br />TO <br />ITEM NUMBER <br />Mayor and City Council <br />7.2 <br />AGENDA SECTION <br />MEETING DATE <br />PREPARED BY <br />Public Hearings <br />September 17, 2012 <br />Jeremy Barnhart, Planning Manager <br />ITEM DESCRIPTION <br />REVIEWED By <br />Request by CSP -Elk River, MN LLC for a Conditional Use <br />Cal Portner, City Administrator <br />REVIEWED BY <br />Permit to Amend the Existing Spectrum High School CUP for a <br />Building Expansion at 17796 Industrial Circle NW, Case No. <br />CU 12 -16 <br />ACTION REQUESTED <br />Approve the Conditional Use Permit amendment, as illustrated on drawings dated September 6, 2012, <br />with the following conditions: <br />1. All comments of the staff comment letter dated August 13, 2012, shall be addressed, including <br />lighting, landscaping, and engineering comments. <br />2. As a Conditional Use Permit is not a Building Permit, the applicant shall apply for all require <br />permits. <br />3. The development shall meet all applicable fire and building codes. <br />BACKGROUND /DISCUSSION <br />Spectrum School is requesting an amendment to the Conditional Use Permit they received in 2011 to <br />operate a school at 17796 Industrial Circle. The amendment would allow the construction of a 6,600 <br />square foot, two -story addition onto the south side of the building. The addition will house the music <br />department on the ground floor and three classrooms on the second floor. As part of the addition, the <br />parking lot will be modified and expanded to accommodate required parking. <br />No changes to the student population cap of 525 are proposed. <br />Planning Commission Comments <br />The Planning Commission reviewed the application at their meeting on September 11, 2012. The <br />Commissioners questioned the internal traffic routing and the design of the building. Ultimately, the <br />Commissioners recommended approval of the amendment as proposed. <br />Public Comments <br />No comments for or against the proposal have been received. <br />FINANCIAL IMPACT <br />None <br />ATTACHMENTS <br />Planning Commission packet dated September 11, 2012 <br />Drawings dated September 6, 2012 <br />P/ V E I E I NY <br />N: \Departments \Community Development \Planning \Case Files \CUP \CU 12 -16 Spectrum \CU 12 -16 Spectrum SR to CC INATMEJ <br />9- 17- 12.docs <br />