Laserfiche WebLink
(24) Small-Load Dumping Site_ The Licensee shall, during all hours of <br /> operation, maintain and operate a separate suitable and safe disposal area for the <br /> dumping of small loads by pickup trucks, cars, and trailers. This separate site shall <br /> be located and operated with due regard for the nature of the vehicles bringing <br /> such loads, and the normal frequency of such dumping. <br /> (25) Oak Wilt Prevention. As a method to prevent oak wilt, Licensee shall not <br /> conduct any tree removal operations at the Landfill Property between April 15 <br /> and July 15 each year. In addition, oak stumps shall be removed prior to April 15 <br /> each year. When removing trees and stumps, Licensee shall prevent damage to <br /> remaining trees. <br /> (26) Alternative Cover. "Alternative Cover" shall be defined as any suitable <br /> clean cover material other than Clean Earth Fill. Alternative intermittent and <br /> intermediate cover material may be used if such cover material is suitable for <br /> compaction, capable of supporting vegetation, and meets MPCA standards set <br /> forth in MN Rule 7035.2815, subpart 6, and Elk River Landfill's Industrial Waste <br /> Management Plan. <br /> (27) Detailed Engineering Plans for Site Construction. Detailed engineering <br /> plans and specification for construction of liner, final cover, surface water, landfill <br /> gas features, leachate management and other significant site <br /> improvements/infrastructure shall be provided to the City prior to initiating the <br /> work. Proposed modifications to the approved plans shall be identified by the <br /> Licensee in a detailed narrative and approved by the City prior to initiating work. <br /> (a) Prior to construction approval of the final development of the site <br /> (cell 20), ERL shall provide an appropriate earthwork balance for <br /> construction and operation such that the amount of fill imported <br /> into the site is minimized to the extent possible. <br /> (b) ERL must provide details which show the transition from the <br /> buried pipe to the ground surface at the edge of the liner system <br /> and frost protection in areas where the depth of burial for leachate <br /> forcemain piping is less than standard. <br /> (c) The mining access road within the west buffer area and cells 18, 19 <br /> and 20 shall be constructed with the alignment shown in the <br /> August 18, 2011 plans. The Screening Plan for the Site will be <br /> modified to show screening for areas within the west buffer area <br /> for the existing Cell 17. Appropriate erosion control protection <br /> shall be provided for all buffer area slopes. <br /> (g) The current storm water plans that were submitted as Engineering <br /> Drawings-Design Plans, March, 2012 must be amended as needed <br /> to include provisions for erosion control in perimeter surface water <br /> 13 <br />