Laserfiche WebLink
(h) Detailed evaluation of all water quality results by means of tables <br /> and graphs. <br /> (i) A groundwater contour map based on the previous years' <br /> groundwater level data. <br /> (j) Annually assess the effectiveness of active landfill gas control <br /> operations based on the results of groundwater and landfill gas <br /> monitoring and incorporate the evaluation in the MPCA Annual <br /> Report for the landfill. <br /> (k) The Annual Operating Report must include a full-sized <br /> engineering plan to fully illustrate all facility features reviewed in <br /> the annual report (landfill gas probes, monitoring wells, gas <br /> collection infrastructure, leachate recirculation infrastructure, etc). <br /> The Plan must identify permitted and remaining volumes <br /> (1) The Annual Operating Report typically includes information <br /> concerning the pressure jetting of the leachate collection system. <br /> ERL must provide a discussion of any major maintenance <br /> activities or corrective actions performed in the Annual Report. <br /> (m) ERL must provide a list of rejected waste loads and summary with <br /> the Annual Operating Report. A summary and analysis of random <br /> load inspections (as provided in section 4.2.1. of the April 2008 <br /> Industrial Solid Waste Management Plan) must be provided with <br /> the Annual Operating Report. <br /> (08) Construction Quality Assurance <br /> A Construction Quality Assurance (CQA) Report shall be submitted to the <br /> City prior to the placement of waste on newly constructed lined areas. A CQA <br /> report shall also be submitted for Landfill areas which receive final cover. A CQA <br /> report shall also be submitted for installation of leachate recirculation drainfield <br /> areas to document position within the cell, suitable base contours and piping <br /> elevations. The report shall demonstrate that the work was completed to the plan <br /> specifications. The Report shall be certified by an engineer registered in the State <br /> of Minnesota and shall include but not be limited to: <br /> (a) All relevant construction specifications; <br /> (b) All shop drawings for prefabricated components; <br /> (c) Photo documentation of all critical aspects of construction; <br /> (d) Deflection testing results for leachate collection and transmission <br /> pipes; <br /> 10 <br />