My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. SR 10-20-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
10/20/2003
>
4.2. SR 10-20-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:13 AM
Creation date
10/23/2003 3:28:57 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/20/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agenda Item #3 <br /> <br />DATE: September 26, 2003 <br />TO: NCDA <br />FROM: Staff <br />RE: Hiawatha LRT Update <br /> <br />MEMORANDUM <br /> <br />Hiawatha light rail opens between downtown Minneapolis and Fort Shelling in April 2004. The <br />rest of the line, through the Minneapolis-St. Paul International Airport and on to Bloomington <br />with a final stop at the Mall of America, is scheduled to open in December 2004. Attached is a <br />September 21, 2003 StarTribune article that summarize the status of the project. Gary <br />Erickson, Executive Director of the Hennepin County Regional Rail Authority, will provide more <br />information about the project's status at the October NCDA meeting and discuss with the NCDA <br />possible dates to tour completed sections of the line. <br /> <br />Action Requested: Discussion. <br /> <br /> Northstar Corridor De velopment Authority <br />2100 3'''~ Avenue, Anoka, Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 www. northstartrain.org <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.