My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 09-11-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2012
>
09-11-2012
>
6.1. ERMUSR 09-11-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2012 2:53:04 PM
Creation date
9/11/2012 9:04:02 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities <br />13069 Orono Parkway <br />P.O. Box 430 <br />Elk River, MN 55330 <br />(763) 441 -2020 <br />UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />Elk River Municipal Utilities Commission <br />Mark Fuchs <br />John Dietz, Chair <br />Line Superintendent <br />Daryl Thompson, Vice Chair <br />Al Nadeau, Trustee <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />September 11, 2012 <br />6.1 <br />SUBJECT: <br />Staff Updates <br />DISCUSSION: <br />• Finished converting feeder 23 out of the power plant from 2400 volts to 7200 volts. <br />• Started rebuilding Quinn Avenue and 6ch Street by Cretex. <br />• Had four new house services. <br />• Continue working on 8ch and Irving rebuild. <br />• Had to switch out and bypass the feeders on Station 14 bank 3 and Station 14 bank 4 <br />substations so we could get the SCADA installed. When we do this we also test the <br />controller and recloser. We found one recloser not working properly and had to remove it <br />to get repaired. <br />• Fixed three street lights that had damage to the concrete bases. We are trying galvanized <br />metal screws in bases that we can install with our digger truck. <br />• Completed installing underground on Co. Rd. 33 west of Co. Rd.]. Xcel Energy <br />contacted me with a clearance issue between their transmission line and our overhead <br />distribution line. <br />• Started rebuilding O'Day and O'Brian Avenue in Otsego. <br />• Had the street lights painted on Freeport Avenue by Cub. <br />• When we go through the underground system in the winter, we find things that need to be <br />fixed so we are working on some underground maintenance. <br />No. P ERER10 01 I`�iATURE <br />Power Provider P O W E 0. f O T O S E R V E <br />
The URL can be used to link to this page
Your browser does not support the video tag.