My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.5. ERMUSR 09-11-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2012
>
09-11-2012
>
2.5. ERMUSR 09-11-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2012 4:15:04 PM
Creation date
9/10/2012 4:15:01 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 8 - <br /> "limited and discrete" standard for waivers established in Black Creek Hydro has not <br /> been modified(id. PP 3, 6) and, in the context of this case, Elk River submits, its very <br /> small size is also relevant. <br /> In Black Creek Hydro,the Commission ruled on rehearing that it would waive the <br /> reciprocity obligation for a utility capable of demonstrating that it owns, operates, or <br /> controls only"limited and discrete transmission facilities (facilities that do not form an <br /> integrated transmission grid)."Black Creek Hydro, Inc., 77 FERC IT 61,232, at 61,941 <br /> (1996) (citing N. States Power Co., 76 FERC ¶61,250, at 62,297 (1996)). This was <br /> consistent with the order below, where the Commission found that a waiver is appropriate <br /> where "any transmission facilities that the applicant owns or controls are limited and <br /> discrete transmission facilities that do not form an integrated transmission grid(e.g., a <br /> single transmission line)."N. States Power Co., 76 FERC¶61,250, at 62,297. <br /> Elk River qualifies for a waiver under the "limited and discrete" standard <br /> established in Black Creek Hydro and reaffirmed in Black Hills Power on April 21, 2011. <br /> In Black Creek Hydro, the Commission found that where an applicant's facilities were, <br /> for example, limited to an individual transmission line, they would be deemed limited <br /> and discrete. Id. Elk River's facilities qualify because they are limited to discrete pieces <br /> of 69 kV equipment, such as breakers, switches, and transformers, located in individual <br /> substations in the Elk River area.12 Elk River's facilities are surrounded by the system of <br /> Nos. 888 and 889.Order No.717 did not change those criteria.")(citations omitted). <br /> 12 See Attachment A,One-Line Diagrams of Station 14 Substation,Otsego Substation,Waco Substation, <br /> North Substation,and West Substation. We note that,as indicated on the West Substation one-line <br /> diagram,there is a single 69 kV switch owned by Elk River but operated by Great River Energy that is <br /> connected directly to Great River Energy's transmission grid. It is located just outside the fence of the <br /> West Substation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.