Laserfiche WebLink
Capital Improvement Plan 2013 thru 2017 <br /> City of Elk River, Minnesota <br /> Project# ST-12 <br /> Project Name � <br /> Signalization of 193rd Avenue & Evans Street <br /> Type Infrastructure Department Infrastructure Improvements <br /> Useful Life 20 years Contact Engineer_..;,,, . <br /> Category Street Construction Priority n/a <br /> t <br /> Description <br /> Install a signal system including EVP at the intersection of 193rd Avenue and Evans Street,Because of the proximity to TH169,the signal system <br /> must be interconnected with the existing highway signal system. <br /> Justification <br /> The construction of 193rd Avenue(2009)street improvement opens 193rd to CSAH 13 allowing another route to and from TH 169, In <br /> anticipation of the increased traffic flow the intersection of 193rd Avenue and Evans Street was constructed to accept a signal system. <br /> Expenditures 2013 2014 2015 2016 2017 Total <br /> Planning/Design 250,000 250,000 <br /> Total 250,000 250,000 <br /> Funding Sources 2013 2014 2015 2016 2017 Total <br /> Municipal State Aid 250,000 250,000 <br /> Total 250,000 250,000 <br /> i <br /> I <br /> i <br /> i <br /> 2013-2017 CAPITAL IMPROVEMENT PLAN Page 10 <br /> I <br />