Laserfiche WebLink
Conditional Use Permit -Amendment <br /> CSP Elk River MN,LLC(Owner)is requesting an amendment to the current CUP to allow a new addition to <br /> accommodate the space needs of Spectrum High School(Tenant). <br /> Project Narrative:We will be constructing a two story addition to the south side of the existing building. The new <br /> addition will be 33'x 100'. The first floor will be for the music department. It will contain a 1,470sf music room <br /> along with student practice rooms and office space for the music staff. The second floor will have a science room <br /> and two additional specialist classrooms. There no intention to increase student enrollment beyond the current <br /> approved level of 525 students. <br /> The exterior of the building will be pre-cast panels to match the existing gymnasium building with insulated <br /> concrete planks for the floor and roof structure. The addition will be designed to meet all current building codes <br /> and life safety requirements. Formal plan submittal for review and comments will be submitted to the Elk River <br /> Building Department upon approval of this CUP amendment. <br /> The addition will eliminate 66 parking stalls from the current parking configuration. To maintain sufficient parking, <br /> we will construct a new parking lot on the east end of the current athletic field. The new parking lot will be <br /> sufficient for 70 parking stalls thus providing 3 more stalls than is needed. <br /> Tenant Information: Spectrum High is a public charter high school which received its original charter in 2006.The <br /> School currently serves grades six through twelve and is located thirty-five miles northwest of the Minneapolis/St. <br /> Paul metropolitan area at 17796 Industrial Circle NW,Elk River,MN. Elk River has a population of more than <br /> 22,000 people with 96%of its ethnic distribution being White,Non-Hispanic.Five hundred businesses are situated <br /> in the Elk River area with approximately 82%of its workforce involved in service-related industries and the <br /> remaining 18%in goods production(Source:City of Elk River Community Profile 2011). <br /> Spectrum High School's core philosophy focuses on providing students with a small school setting which provides a <br /> college preparatory education with an emphasis on technology.In addition,students are also given an opportunity <br /> to become involved in their community through an intentional program of service learning.Currently,Spectrum <br /> has nine Colleges in the School(CIS)courses through Anoka-Ramsey community College and the University of <br /> Minnesota. Spectrum High School is located in a permanent building with plans to expand the campus to <br /> Include a gymnasium and outdoor sports facilities. <br /> Preliminary Meeting with Building Department: We met with Bob Ruprecht and Cliff Anderson to review the <br /> preliminary expansion plan. Initial comments that are incorporated into this submittal are: <br /> • New parking lot drive lane cannot be more than 150'deep without a turn around <br /> • New parking drive lane must be 24'for two directional traffic and 20'for single direction traffic <br /> • Must replace lost west steps on the event entrance <br /> • Must ensure that egress out of the gym meets code <br /> • Other issues will be evaluated during plan review <br /> Landscaping Plan and Tree Preservation Plan: Current Landscaping will not be disturbed and there will not be any <br /> loss in trees and planting during this addition. Because of this,there is no landscaping or tree preservation plan. <br /> J.Kou Vang,Project Manager for CSP-Elk River MN,LLC <br /> Mobile:651.491.1970 I Email:ikvang@ibrealtyco.com <br />