My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. CCSR-HRSR 09-04-2012 SPEC JOINT (2)
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
09-04-2012 JOINT
>
3. CCSR-HRSR 09-04-2012 SPEC JOINT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2012 12:32:51 PM
Creation date
9/4/2012 1:53:56 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
9/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • III <br /> Refined Large Group Concept-June 4, 2007 meeting • Highway 10 Frontage from Jackson Avenue to Gates <br /> o High scale commercial/office building at intersection of <br /> ❖ Core Downtown Main Street&Railroad Drive to maximize view of river <br /> o Maintain the"Brick Block" through rehabilitation <br /> o Allow for redevelopment of area between The Bluffs& + East Main Street Connecting to Highway 169 <br /> First National/Dare's 0 Redevelop as commercial(office/service) rather than <br /> o Proper scale,e.g.row homes,to buffer single-family single-family residential <br /> homes and new developments o Alley to serve as main access to buildings along <br /> o Main Street between Morton&Lowell should be Main/minimal setbacks along Main to obtain"urban feel" <br /> considered a good transition area between new o Continue tree-lined parkway along Main Street to Hwy 169 <br /> developments&single-family homes <br /> o First floor commercial to be based on market demand + Quinn Avenue Area <br /> o Discourage"leapfrog"redevelopment o A separate redevelopment study of this area should be <br /> o Utilize design standards to promote historic"look" for completed <br /> new buildings <br /> o Conduct traffic studies on a project-by-project basis to <br /> determine roadway improvements for certain land uses -.�----• �- <br /> 1-�/ i !- i <br /> o Remove outside storage to incorporate a public access to ,I1. ill 1 :.i_ <br /> Mississippi River(at Municipal Utilities building) ii- `,.• .. i . '--=�.` ' t <br /> East Jackson Avenue Corridor " • !.�•; <br /> r 1 •.- <br /> L4:.! .-° ,-- <br /> o Jackson becomes a tree-lined parkway design as primary .fr..: ...•; -.A, g..1 ,-' <br /> corridor *41•-••:.; ' `; t.7.. '' I'1 .•i g <br /> o Single family homes fronting east Jackson may be removed 1� 1� ;.�• w: <br /> to accommodate live/work structures ;+ - •+s. :: ! '� .� ;'�j <br /> .w .�'�. ,'i. a • • -I- <br /> o Alley to serve as main access to buildings along --- %' •. •-• r • ''-'-.o a - <br /> Jackson/minimal setbacks along Jackson to obtain"urban -___ ' ••,! ' :-.....4 ill I r'A ♦r .•■- ..!0•11 <br /> feel" 14 -•- g <br /> • <br /> West Jackson Avenue Corridor Including the Current Industrial <br /> Area THE 20 YEAR VISION <br /> o High density residential abutting Lion's Park <br /> o "Anchor"commercial/institutional land use needed on <br /> southwest corner of Jackson&School Street Figure A-Overall Land Use Concept <br /> o Create roadway connection between Jackson&Lion's <br /> Park Drive <br /> Draft as of September 4, 2012 - Part IV,page 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.