My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. CCSR-HRSR 09-04-2012 SPEC JOINT (2)
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
09-04-2012 JOINT
>
3. CCSR-HRSR 09-04-2012 SPEC JOINT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2012 12:32:51 PM
Creation date
9/4/2012 1:53:56 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
9/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North of Highway I 0 • Concentrate mixed uses in taller buildings at the <br /> intersection of Main Street and 4th Street to maximize views <br /> ❖ Reconfigure roadway patterns through the Study area to of the Mississippi River. <br /> respect the Highway 10 future plan. <br /> ❖ Manage storm water drainage through a greenway <br /> • Concentrate employment generating land uses(e.g. concept that connects Lion's Park to maximize views of the <br /> office/medical) north of Highway 10 to bring daytime users Mississippi River. <br /> that support the core downtown commercial. <br /> ❖ Establish higher density residential around Lion's Park to <br /> increase its value and desirability. <br /> • <br /> oas of September 4, 2012 III - Part II,page 3 -• <br />
The URL can be used to link to this page
Your browser does not support the video tag.